Similar Projects
State Street Sanitary Improvements
Renovation, Infrastructure
Bidding
Ypsilanti, MI 48198

Biddle Point Pump Station Improvements
Renovation
Bidding
Mackinac Island, MI

Replacement Of Submersible Pumps At 4 Lift Stations -Alpena Combat Training Center
Renovation
Post-Bid
Alpena, MI

Brye Road Booster Station Improvements
New Construction
Post-Bid
Ludington, MI

Cyl-Tec Pump Station Replacement
Results
Tecumseh, MI

Griswold Road Pump Station
Results
Port Huron, MI

Replacement Sump Pumps at Townsend Towers
Renovation
Post-Bid
Dearborn, MI 48126

CSO Pump Station and RTB Improvements Project
Results
East Lansing, MI

Lake Michigan College Lift Station
Demolition, Infrastructure
Post-Bid
Benton Harbor, MI

Clark Road Pump Station Improvements Srf Project #5695-01
Results
Ypsilanti, MI

Lift Station C-1 Improvements Project
Results
Edwardsburg, MI

Lakewood Wastewater Authority Phase 2 Collection System Improvement - Pump Stations 11 And 16 Upgrades
Results
Lake Odessa, MI 48849

Repair of Pump 1 at Elm St. I-696 Pump Station
Results
Roseville, MI 48066

Dundee Welcome Center-Replace Lift Station
Results
Petersburg, MI 49270

Country Acres Pump Station Improvements
Results
Plymouth, MI 48170

Reported 12/22/2021 12:00 AM
Project Title

Pump Station Modernization

Physical Address View project details and contacts
City, State (County) Saline, MI   (Washtenaw County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of pump station improvements at four (4) sites as well as SCADA improvements at numerous locations throughout the City of Saline.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents