Similar Projects
Reported | 07/21/2022 12:00 AM |
Project Title | Emergency IDIQ Contract - Emergency Sump Pump Replacement in Tank Rooms Citywide With Borough of Brooklyn Focus |
Physical Address | View project details and contacts |
City, State (County) | New York, NY (New York County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Pumps and Wells |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected August 2022, |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1/2 HP High Heat 200 F Vortex Sump Pump 10-40 GPM up to 21 ft of head 115 Volt single phase with 50 ft power cable suitable up to 200 (F), with a sensor used to detect the presence of water in the seal oil chamber, with 2" discharge and Vortex Impeller with a NEMA 4X controller and 1 float 2HP High Heat 200 F Shredder Sump Pump 50-150 GPM, 10-35ft of Head 208/230V Single Phase with 50'Power Cable Suitable Up to 200 (F) with Sensor to Detect Presence of Water in Seal Oil Chamber with 3" Discharge & Chrome Impeller with Nema 4X Controller and 1 Float |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |