Similar Projects
Pheasant Branch Stream bank Stabilization Mainstem Pond
Infrastructure
Bidding
$1,077,485 est. value
Middleton, WI 53562

Pheasant Branch Stream Bank Restoration and Habitat Enhancement
Infrastructure
Bidding
$400,122 est. value
Middleton, WI 53562

2021 Gramling Lane Culvert Replacement
Post-Bid
Less than $300,000 est. value
Dousman, WI 53118

2021 Culvert Pipes
Post-Bid
WI

Bliss Road Alpine Inn Culvert Replacement
Results
Less than $62,000 est. value
La Crosse, WI 54601

Lawn Drainage Improvements
Results
$80,000 est. value
Maple Bluff, WI

Maintenance Dredging and Culvert Replacement
Infrastructure
Bidding
$700,000 est. value
Columbus, WI

Concrete Box Culverts
Post-Bid
WI

Site Utility Distribution System Replacement - Phase 1
Results
$3,000,000 est. value
Menomonie, WI 54751

Green Bay - Abrams, Norfield Road - USH 141
Infrastructure
Bidding
$12,000,000 to $12,999,999 est. value
Suamico, WI 54173

Cth N Box Culvert Extension
Post-Bid
Sparta, WI

2021 Street and Drainage Improvements
Results
$500,000 est. value
Hobart, WI

Prentice - Bradley, Scott Creek Box Culvert
Infrastructure
Bidding
$1,500,000 to $2,750,000 est. value
Tomahawk, WI

Village at Autumn Lake Box Culvert
Post-Bid
Madison, WI

2021 Paving Drainage
Results
WI 53182

Last Updated 06/14/2022 11:07 AM
Project Title

Port Washington Harbor Breakwater Repairs

Physical Address View project details and contacts
City, State (County) Port Washington, WI   (Ozaukee County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $933,900
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Original Set Aside: Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13) PROJECT INFORMATION: The proposed project consists of repairing the existing south breakwater in order to maintain safe passage for vessels entering and exiting the harbor. Repair work will consist of placement of new armor stone and resetting existing armor stone as needed.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents