Similar Projects
Last Updated | 04/08/2020 12:07 PM |
Project Title | Phase III Wastewater Collection System Project |
Physical Address | View project details and contacts |
City, State (County) | PA (McKean County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contract No. 2B involves the installation via directional drilling of approximately 142,700 LF of 1.25”, 1.5”, 2”, 3”, 4”, 6”, and 8” diameter high density polyethylene low pressure sewer pipe and force main; approximately 360 low pressure sewer service connections and laterals, curb stops and curb boxes; manholes, air release valves, cleanouts, isolation and check valves, three duplex submersible sanitary sewer pump stations; one intermediate duplex grinder pump station; and all associated appurtenances and surface restoration. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |