Similar Projects
40th-San Pablo Transit Hub and 40th Street Reconstruction - City of Emeryville
Infrastructure
Conception
$10,787,000 est. value
Emeryville, CA 94608

Castro Valley Boulevard Corridor Improvements from San Miguel Avenue to Stanton Avenue - Alameda County
Infrastructure
Conception
$1,250,000 est. value
Castro Valley, CA 94546

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Sidewalk Repair Project
Alteration
Design
$500,000 to $1,000,000 est. value
Dublin, CA 94568

Precast Concrete Pavement, Electronic Toll System, JPCP, CB and Structural Concrete
Infrastructure
Bidding
$170,000,000 est. value
Sunol, CA 94586

East Bay Greenway Segment II (Seminary Avenue to 69th Avenue)
Infrastructure, Alteration
Bidding
$3,633,448 est. value
Oakland, CA

Highway Safety Improvement Program HSIP 8 Oakland Hills
Infrastructure
Post-Bid
Oakland, CA

Roadway Repairs
Infrastructure
Post-Bid
Cloverdale, Fremont, CA 95425

Accessible Improvement Program - Phase 1
Infrastructure
Results
$1,000,000 to $5,000,000 est. value
Oakland, CA

Excavation, HMA, Structural Concrete, Minor Concrete and Drainage
Infrastructure
Results
$23,400,000 est. value
CA

Sunol Ridge Roadway Reinforcement - Alameda County
Alteration
Conception
$1,000,000 est. value
Castro Valley, CA 94552

Apply High Friction Surface Treatment
Infrastructure
Design
$3,502,000 est. value
Sunol, CA

2022 Citywide Pavement Rehabilitation - As Needed Paving Services
Infrastructure
Bidding
$13,486,600 est. value
Oakland, CA

Airport Pavement
Infrastructure
Post-Bid
Hayward, CA 94541

General Engineering (A License) Construction, San Francisco, San Mateo, Santa Clara, and Alameda Counties
Infrastructure, Alteration
Results
$5,000,000 est. value

Reported 07/15/2022 09:22 AM
Project Title

Hopkins Street Corridor Project - PWTRPL2001 - City of Berkeley

Physical Address View project details and contacts
City, State (County) Berkeley, CA 94703   (Alameda County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $540,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a mixed-use development in Berkeley, California. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot. Public engagement, multimodal transportation study, and conceptual design for pedestrian and bicycle safety improvements and placemaking. Detailed design will occur through the FY23 Street Rehab project. The construction budget will cover hardscape features installed during the Street Rehab project, including concrete bulb outs at the intersections with Josephine and Monterey, curb cuts for on-street parking to create space for protected bike lanes between Monterey and Gilman, realignment of raised islands at The Alameda, and a signal modification and associated lane reconfiguration at Sacramento Street. Installation of concrete medians for a protected bike lane, improvement of five intersections, and pavement rehabilitation, including Green Infrastructure will be incorporated into the FY23 and FY24 Annual Street Rehabilitation Projects. This project is in included in the City of Berkeley FY 2023-2027 Capital Improvement Plan (CIP). As of July 14, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents