Similar Projects
SR211 at Cedar Creek Road Intersection Improvement - County of Barrow
Infrastructure
Conception
$2,500,000 CJ est. value
Winder, GA 30680

SR211 at Cedar Creek Road Intersection Improvement - County of Barrow
Infrastructure
Conception
$2,500,000 CJ est. value
Winder, GA 30680

Murphy Oil #6766 / Winder
Demolition, New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Winder, GA 30680

Construction of a Bridge and Approaches on Old Thompson Mill Rd (CR 268)
Demolition, New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Winder, GA 30680

Construction of a Bridge and Approaches on Old Thompson Mill Rd (CR 268)
Demolition, New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Winder, GA 30680

2022 LMIG Micro Surfacing
Infrastructure
Post-Bid
Winder, GA

2022 LMIG Mill and Overlay
Infrastructure
Post-Bid
Winder, GA

Natasha Drive Roadway Improvements
Infrastructure
Results
Auburn, GA 30011

Milling, Inlay, Plant Mix Resurfacing and Shoulder Rehabilitation on SR 81
Infrastructure
Results
$4,000,000 est. value
Winder, GA 30680

Apalachee Church Road Townhomes
New Construction, Infrastructure
Pending Verification
$40,300,000 CJ est. value
Auburn, GA 30011

Dirt Road Paving - Joseph Griggs Road - Barrow County
Infrastructure
Conception
$300,000 CJ est. value
Winder, GA 30680

Hwy 53 Water Treatment Plant Expansion
Infrastructure
Bidding
$32,257,000 CJ est. value
Winder, GA 30680

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

Widening and Reconstruction on SR 211
Infrastructure
Results
$10,000,000 est. value
Winder, GA 30680

Water Line Replacement - Double Bridges Road At Bowman Mill - Barrow County
Infrastructure
Conception
$1,500,000 CJ est. value
Winder, GA 30680

Last Updated 07/11/2023 09:41 AM
Project Title

Construction of a Bridge and Approaches on Harbins Rd (CR 954)/patrick Mill Rd (CR 93)

Physical Address View project details and contacts
City, State (County) Winder, GA 30680   (Barrow County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $2,891,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

0.198 Mile of Construction of a Bridge and Approaches on Harbins Rd (Cr 954)/patrick Mill Rd (Cr 93) Over Apalachee River. Counties: Barrow, Gwinnett District 1 - Gainesville, Area Office 1 - Gainesville ALL questions and comments must be submitted by the close of business of the Friday two weeks before the letting. All questions and comments received after the Friday before the week of the Letting will be documented, but a response will not be provided. For those contractors who are currently prequalified as a GDOT Construction Prequalified Contractor or Registered Subcontractor through GDOT's Construction Bidding Administration Office, and want to be prequalified to perform maintenance projects under the Routine Maintenance Services Program, there is now a modified prime contractors application form available. W e welcome you to participate. The application form and all applicable documents, resources and other guidance may be found on the GDOT website. Proposals shall only be submitted electronically as specified in the Specifications; and shall be accompanied by a proposal guaranty in the indicated amount in the form of a Certified Check, Cashiers Check or Bid Bond on the form issued by the Department. This advertisement is merely an invitation for the submission of bids which will be considered as offers for performance of work by the submitting party. The State reserves the right to reject any or all bids. The surety for bid bonds and performance and payment bonds shall be a company acceptable as surety on Federal bonds and listed in the current Federal Register and licensed in the State of Georgia. The surety for bid bonds and performance and payment bonds shall be a company acceptable as surety on Federal bonds and listed in the current Federal Register and licensed in the State of Georgia. For any web site-related issues, please contact the following individual: William Dunwoody: 404-631-1147 For amendment related questions or issues regarding projects advertised, please contact the following individual: Tamara Crawford: 404-631-1728 Quantities Shown Herein Are for Information Only and Should Not Be Used for Bidding Purposes. The Department Reserves the Right to Change These Quantities Without Notice. Questions or comments call (404) 631-1147 GADOT - 002 - Construction of a Bridge and Approaches on Harbins Rd (CR 954)/patrick Mill Rd (CR 93)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents