Similar Projects
RFP Construction Manager - Riverton High School Auditorium
New Construction, Infrastructure - 12,924 SF
Post-Bid
$8,200,000 CJ est. value
Riverton, WY 82501

District 5 Bridge Rehabilitation
Infrastructure
Post-Bid
$500,000 CJ est. value
Ethete, WY 82510

Lakeview Cabin Foundation Replacement
Alteration
Post-Bid
Casper, WY 82601

Transit Facility Parking Improvements
Infrastructure
Results
$182,453 CJ est. value
Casper, WY 82601

Pre-Demolition Asbestos Abatement for Dewitt Student Center Building
Term Contract, Infrastructure
Post-Bid
$100,000 CJ est. value
Powell, WY 82435

B5 Expand Room 211
Renovation
Bidding
$100,000 CJ est. value
Sheridan, WY 82801

Sheridan Streets (Various Locations)
Infrastructure
Post-Bid
$500,000 CJ est. value
Sheridan, WY 82801

Last Updated 12/12/2022 05:33 AM
Project Title

EMA/CLCPH Archer Storage Facility

Physical Address View project details and contacts
City, State (County) Cheyenne, WY 82007   (Laramie County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $3,262,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Laramie County requests Lump Sum bids for Work on the approximately 19,507 square foot new EMA/CLCPH Archer Storage Facility, at Archer, Wyoming, for all divisions of the Work represented in the Construction Documents, including General Construction, Earthwork and Site Utilities, Concrete Foundations, Concrete Slabs, Masonry, Prefabricated Metal Building Package, Metal Building Erection, Gypsum Board Assemblies, Acoustical Ceilings, Door and Hardware Material, Building Windows, Overhead Doors and Coiling Doors, Folding Doors, Painting and Wall finishing, Tiling and Flooring, Specialties, Mechanical, and Electrical Work, Landscaping and Irrigation, Site Concrete and all miscellaneous aspects of Work to complete the construction of the Project. Est. Completion Date: Jan. 3, 2024

Details

19,507 SF.
Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents