Similar Projects
9 Mile Pump Station Design Project
Renovation
Bidding
Clinton Township, MI

Wastewater System Improvements – Lift Station No. 79
Renovation
Bidding
New Buffalo, MI

Cyl Tec Pump Station and WWTP Actuator Valve Replacement
Post-Bid
Tecumseh, MI

Booster Pump Station Repairs and Upgrades: Phase 1 / Phase 2
Post-Bid
Ann Arbor, MI

Eight Mile Road Pump Station Aboveground Diesel Storage Tank
Results
Less than $142,900 est. value
Waterford, MI

Fairview Sewage Pumping Station Improvements
Results
Detroit, MI

Novi Pump Station Rehabilitation (Drakes Bay And Wixom Rd)
Renovation
Bidding
Novi, MI

Pump Station Improvements
Post-Bid
Less than $750,000 est. value
Brooklyn, MI

Replacement of Water Pump at East Pump Station
Results
Flint, MI

Pump Station Replacement
Bidding
Oscoda, MI

Charter Township of West Bloomfield Lift Station 1 Site Improvements and Upgrade
Post-Bid
MI

Northern Sanitary Pump Station Rehabilitation
Results
Port Huron, MI

Hvac Improvements Oakwood CSO Facility - 1
Renovation
Bidding
Detroit, MI

Elementary Gross Motor Room Overhead Lift System
Post-Bid
Traverse City, MI 49686

Wastewater Capital Improvements
Results
Less than $100,000 est. value
Cassopolis, MI 49031

Last Updated 07/31/2020 09:19 AM
Project Title

Lift Station C-1 Improvements Project

Physical Address View project details and contacts
City, State (County) Edwardsburg, MI   (Cass County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes improvements at the existing C-1 lift station for Ontwa Township located at the intersection of Elkhart Road and Sandy Beach Drive, Edwardsburg, Michigan. The work includes: removing two existing poly tanks, providing and installing two new double walled polymer tanks (550 gallons and 5,000 gallons), providing and installing electrical, controls and two chemical feed pumps in a cabinet pumps for new chemical feeds for bioxide and caustic and associated feed lines installed in conduit, concrete flatwork including a drive and flatwork within the limits of the station, and the installation of a standalone emergency shower unit to be supplied by the Township. The work will also include the providing and installing a new 6-foot pre-cast concrete manhole to house a wastewater grinder on a rail system (Vogelsang X-Ripper) upstream of the existing station

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents