Similar Projects
Rio Grande LNG
New Construction, Infrastructure
Design
$9,000,000,000 CJ est. value
Port Isabel, TX 78578

New Terminal and Runway Expansion - Brownsville South Padre Island International Airport
New Construction, Infrastructure - 20,000 SF
Design
$29,600,000 CJ est. value
Brownsville, TX 78521

7-Eleven #42250 - Harlingen
New Construction, Infrastructure - 4,730 SF
Bidding
$800,000 CJ est. value
Harlingen, TX 78550

Bulk Cargo Dock Rail Improvements
Infrastructure
Bidding
$300,000 CJ est. value
Brownsville, TX 78520

StayApt Suites - Sitework
Infrastructure
Post-Bid
Brownsville, TX 78526

Rising Scholars Academy
New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Olmito, TX 78575

Excavation, Loading and Hauling Services
Term Contract, Infrastructure
Results
Brownsville, TX

Reconstruction of One (1) Home
New Construction
Results
Port Isabel, TX

Buffalo Wings and Rings
New Construction, Infrastructure - 5,142 SF
Construction
$1,200,000 CJ est. value
Harlingen, TX 78552

2022 Street Rehabilitation Project - Projects 1 - 37
Infrastructure
Construction
$2,185,384 CJ est. value
La Feria, TX 78559

Casita Acacia Residential Development
New Construction
Pending Verification
Brownsville, TX 78521

Eyal Turgeman
New Construction, Infrastructure - 1,960 SF
Pending Verification
$150,000 CJ est. value
South Padre Island, TX 78597

Texas LNG
New Construction, Infrastructure
Design
$5,000,000,000 CJ est. value
Brownsville, TX 78520

2022 Placement Areas 5B, 7 and 8 Improvements
Infrastructure
Bidding
$100,000 CJ est. value
Brownsville, TX 78520

Olmito Nature Park
Infrastructure
Post-Bid
$365,800 CJ est. value
Brownsville, TX 78521

Last Updated 10/27/2022 09:50 AM
Project Title

Housing Rehabilitation and Reconstruction Program

Physical Address View project details and contacts
City, State (County) Harlingen, TX 78550   (Cameron County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $271,390 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Harlingen Community Development Department is formally accepting separate sealed bids on behalf of 2 qualified homeowners for the Housing Rehabilitation/Reconstruction Program. This program is funded by the U.S. Department of Housing and Urban Development. No bid may be changed after the bid date, although any bid may be withdrawn and resubmitted before that date. Any bids received after the bid date and time specified in the bid packet will be returned unopened The City, on behalf of the homeowners, specifically reserves the right to reject any and all bids received, to waive irregularities or informalities in any or all bids and to accept any bid which is deemed to be in the best interest of the owner and the City. All bids become the property of the homeowners and the City. All first time Bidders/Contractors must be approved prior to the award of a Bid. A Contractor Application must be completed by all Bidders and all references will be checked prior to award. Bidders must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex, familial status, handicap, national origin, or any other protected class. Preference will be given to Section 3 Business Concerns Any firm/owner/officer that is debarred, suspended or otherwise excluded from or ineligible for participation in federally funded programs may not undertake any activity in party or in full under this project. Accommodations for individuals with handicaps/disabilities or limited English proficiency shall be made upon request by calling 956-216-5180, TTY 1-800-735-2989 For further information, please contact Norma Benavides or Sandee Alvarez at (956) 216-5180, nbenavides@myharlingen.us or salvarez@myharlingen.us The Contract Documents are complimentary, and what is called for by any one shall be as binding as if called for by all. In case of conflict between any of the Contract Documents, priority of interpretation shall be in the following order: Federal and State Laws, Standard Form of Agreement, Performance and Payment Bonds, Special Bonds (if any), Bid Proposal, Instructions to Bidders, Notices to Bidders, Technical Specifications, Plans, General Conditions of Agreement, and Supplemental Conditions of Agreement. Prevailing Wage Requirement: Yes It is understood and agreed that the work is to be completed within ninety (90) calendar days after the date on which the work is to commence. Penalties will amount to $75.00 per day for failure to complete the project in the specified time. Bidresult - Barcenas Rell Transport LLC $134,210 Segoviano Rell Transport LLC $137,180

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents