Similar Projects
HHS and DES Mechanical Replacements and Controls
Alteration
Bidding
$2,698,900 est. value
Concord, NH 03301

Concord
Alteration
Bidding
$3,600,000 est. value
Concord, NH 03301

Heating-Ventilating-Air Conditioning (HVAC) Energy Management and Control System Inspection and Service
Alteration
Post-Bid
Hooksett, NH

Steam Distribution System Maintenance and Repair Services
Term Contract
Post-Bid
Concord, NH 03301

NHARNG Cooling Upgrades
Results
Less than $1,200,000 est. value
Concord, NH 03301

HVAC Unit - Supply and Install
Results
Concord, NH

Concord - Replacement of Four Air Handling Units
Alteration
Bidding
$1,800,000 est. value
Concord, NH 03301

Boiler Replacement - Harold Martin School
Alteration
Post-Bid
Hopkinton, NH 03229

HVAC Maintenance and Repair Services
Term Contract
Results
Concord, NH

NHARNG Building F Boiler Replacement
Alteration
Bidding
$300,000 est. value
Concord, NH 03301

Maple Street School RTU Replacement
Alteration
Post-Bid
Hopkinton, NH 03229

Vehicle Exhaust Rail System (Supply & Install)
Results

Maintenance and Repair of Dual-Fuel Boilers and Hot Air Furnaces
Alteration
Post-Bid
Franklin, NH

HVAC Preventative Maintenance and Repair Services
Alteration
Results
Berlin, Concord, Manchester, NH

UNH Law - 2 White Street HVAC Removal and Replacement of 3 Rooftop Units
Alteration
Post-Bid
$500,000 est. value
Concord, NH 03301

Last Updated 07/10/2022 11:59 PM
Project Title

HVAC - Boiler replacement

Physical Address View project details and contacts
City, State (County) Concord, NH 03301   (Merrimack County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $30,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and Disposal of existing boilers, expansion tank and vent piping. Installation of 2-High Efficiency Boilers in the original location. Boiler mounting rack. Install 2-Boiler Pumps. Install condensate neutralization packages. Low water cutoff safeties. Install venting and fresh air piping from boilers to the outside of building. Install a new expansion tank. Reconnect all water piping from new boiler to existing piping. Provide electrician to reconnect high and low voltage wiring. Reconnect gas piping to the new boilers.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Heating Boilers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents