Similar Projects
SLCC JC HTC Renovation F2033
Renovation
Bidding
$1,030,000 est. value
West Jordan, UT 84088

Helix Building
New Construction - 250,000 SF
Sub-Bidding
$78,439,728 est. value

Health Sciences Campus Office Building
Post-Bid
Less than $78,439,728 est. value
Salt Lake City, UT

Building 565-EEJMRB Vivarium Expansion
Renovation - 8,300 SF
Post-Bid
Less than $3,200,000 est. value
Salt Lake City, UT 84112

Construction Management / General Contractor - BPRB Level 1 Lab Remodel
Renovation - 14,000 SF
Results
Less than $4,933,402 est. value
Salt Lake City, UT

Fieldhouse Seismic Upgrade
Term Contract
Results
Less than $2,409,976 est. value
Salt Lake City, UT

Uu Meb Bldg Ece Lab Remodel Phase 2
Construction
Less than $491,794 est. value
Salt Lake City, UT 84112

Gillmor Hall Addition
Addition - 335,606 SF
Construction
$8,500,000 est. value
Salt Lake City, UT 84105

CMGC Building 525 1st Floor East Side Radiology Backfill
Demolition
Post-Bid
$2,290,478 est. value
Salt Lake City, UT 84112

HEB Phases 3 and 4 Lab Renovations 3rd Floor East North Tower
Renovation
Results
Less than $120,600 est. value
Salt Lake City, UT 84112

CMGC - Relocate OB Emergency and Build 3 New Labor Delivery Rooms
Construction
Less than $1,578,828 est. value
Salt Lake City, UT 84112

Med X - Wall Panelization
Renovation - 2,500 SF
Post-Bid
Less than $129,285,000 est. value
Salt Lake City, UT

Union Building Student Success Suite - Tenant Improvement
Results
Less than $643,177 est. value
Salt Lake City, UT 84112

HEB 3rd Floor SE and 4th Floor SE Lab Renovation
Renovation
Post-Bid
$100,000 est. value
Salt Lake City, UT 84112

Hybrid Operating Room - CMGC
Term Contract
Results
Salt Lake City, UT 84112

Reported 06/02/2020 10:18 AM
Project Title

Science and Industry Building, 3rd Floor Laboratory Remodel

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84123   (Salt Lake County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method
Project Status Construction Commenced April 2020
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remodel of the north wing of the 3rd floor of the existing Science and Industry Building at the Salt Lake Community College, Redwood Campus in Taylorsville. Remodel includes resizing lab spaces to accommodate five teaching labs and two storage/research/prep areas. Construction will be phased to allow occupancy of the Organismal Biology lab, the Anatomy Lab and one Storage/Research/Prep area to be operational in Phase 1 construction. In Phase 2 the Microbiology Lab (2) 1615 Labs, the Physiology Lab and one Storage/Research/Prep will be occupied while the 3 remaining spaces are complete. Corridor and access to egress stairs shall remain accessible throughout construction. Project Location: Science and Industry Building, 3rd Floor Laboratory Remodel, located on the Taylorsville - Redwood Campus of Salt Lake Community College, Salt Lake City, Utah 84123.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents