Similar Projects
Harvey-Swanson Elementary Renovations
Renovation
Conception
Ortonville, MI 48462

Oakwood Elementary Renovations
Renovation
Conception
Ortonville, MI 48462

Novi Medical Building
New Construction, Infrastructure - 2,558 SF
Design
$1,486,198 CJ est. value
Novi, MI 48377

Bebb Oak Meadows Mixed-Use
New Construction, Infrastructure
Design
$35,000,000 CJ est. value
Rochester Hills, MI 48307

Hot Mix Asphalt Cold Milling and Resurfacing, Pavement Repairs, Concrete Curb and Gutter Repairs, Drainage Improvements, Concrete Patching, Sidewalk Ramp Upgrades, Traffic Signals
Infrastructure
Bidding
$46,122,000 CJ est. value
Detroit, MI 48226

2023 Water Main Improvements
Infrastructure
Bidding
$1,400,000 CJ est. value
Royal Oak, MI 48067

CDBG ADA Sidewalk and Ramp Installation Project
Infrastructure
Post-Bid
$800,000 CJ est. value
Milford, MI 48381

Winter Park Lighted Tubing Hill
Term Contract
Post-Bid
Bloomfield Hills, MI 48304

Southfield Public Schools High School ITC Facility
Results
Southfield, MI 48033

High School Pool, Fitness Center and Locker Rooms
Renovation
Results
Ferndale, MI

ATAP Early Childhood Gymnasium and Classroom Renovations
Renovation - 9,691 SF
Construction
$700,000 est. value
Pontiac, MI 48341

The Goddard School and Annex
New Construction, Build-Out - 31,564 SF
Construction
$6,500,000 est. value
Beverly Hills, MI 48025

Pella-Dar Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Royal Oak, MI 48067

Zeenat Plaza
New Construction, Infrastructure - 21,421 SF
Pending Verification
$11,000,000 CJ est. value
Rochester Hills, MI 48307

Brandon Middle School Renovations
Renovation
Conception
Ortonville, MI 48462

Last Updated 01/26/2023 11:36 PM
Project Title

Synthetic Turf & Track Renovations 2023

Physical Address View project details and contacts
City, State (County) Troy, MI 48098   (Oakland County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $483,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Questions must be received no later than 1:00 pm Local Time, Thursday, December 8, 2022; at no other time prior to the bid opening will questions/concerns be addressed or accepted and may be faxed to: 248.823.4077, or emailed as a Word document to: PurchasingOffice@troy.k12.mi.us. For all labor, material, equipment, and all other services to complete Troy School District 2023 Synthetic Turf & Track Renovations projects. All bidders must provide familial disclosure in compliance with MCL 380.1267 & attach this information to the bid proposal. The bid proposal will be accompanied by a sworn & notarized statement disclosing any familial relationship that exists between the owner or any employee of the bidder & any member of the Troy School Board or the Troy School District's Superintendent. Also, a sworn and notarized Affidavit of compliance for the Iran Economic Sanctions Act certifying the vendor does and will comply with Public Act 517 of 2012 shall accompany all proposals. Both forms will be enclosed in the specification booklet that shall be used for this purpose. The District will not accept a bid proposal that does not include these sworn and notarized disclosure statements. Certified check, money order or Bid Bond by an approved surety company must accompany each proposal in an amount not less than 5% of the bid amount. The price proposal shall be good for a period of no less than 60 days from the bid date, unless otherwise noted. Bid Bond can be included with the bid through Buildingconnected.com. Certified check and money order must be received prior to the bid due date and time at 1140 Rankin, Troy, MI 48083. In accordance with Michigan Compiled Laws Section 129.201, successful bidders whose proposals are $50,000 or more, for any bid category, will be required to furnish a U.S. Treasury Listed Company Performance and Payment Bond in the amount of 100% of their bid. The cost of the Bond shall be identified within each proposal. The Troy Board of Education reserves the right to accept or reject any or all bids, either in whole or in part; to award the contract to other than the low bidder; to waive any irregularities and/or informalities; and in general to make awards in any manner deemed to be in the best interest of the owner. Bid Results :: Proposal A - Site Work Turf :: S&H Trucking & Excavating :: $343,000.00 Proposal B - Synthetic Turf :: Sprinturf :: $460,440.00 Proposal C - Track Surface :: Goddard Coatings Company :: $194,105.00 Proposal D - Site Work Track :: Nagle Paving Company :: $534,790.00

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Selective Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents