Similar Projects
Topeka Regional Business Center - Bldg. 612 Drainage Improvements
Infrastructure
Design
$100,000 CJ est. value
Topeka, KS 66612

Topeka Regional Business Center - Bldg. 612 Drainage Improvements
Infrastructure
Design
$100,000 CJ est. value
Topeka, KS 66612

RFP D/B - Federal Correctional Institute (FCI) - City of Leavenworth
New Construction, Infrastructure
Bidding
$300,000,000 CJ est. value
Leavenworth, KS 66048

Ulysses Airport - Rehabilitate Runway 17-35
Infrastructure
Bidding
$500,000 CJ est. value
Ulysses, KS 67880

Signing
Infrastructure
Sub-Bidding
$3,000,000 CJ est. value
Lucas, KS 67648

Intelligent Transportation System
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Riley, KS 66531

FOLS - Construct two ABA compliant walkways
Infrastructure
Post-Bid
$100,000 CJ est. value
Larned, KS 67550

Great Bend Police Station and Court Facility
New Construction, Infrastructure
Post-Bid
$8,000,000 CJ est. value
Great Bend, KS 67530

Wyandotte County Water Line - Phase V
Results
$475,000 to $650,000 est. value
Kansas City, KS

Water System Improvements
Results
Cambridge, KS

Hilltop Farms
New Construction, Infrastructure
Pending Verification
$130,000,000 CJ est. value
Spring Hill, KS 66062

Riverfront Village
New Construction, Infrastructure - 512,000 SF
Pending Verification
$127,000,000 CJ est. value
Wichita, KS 67202

Demolition Bid - 1021 West 4th Street - Structure and Accessory Structure
Demolition, Infrastructure
Design
$10,000 CJ est. value
Fort Scott, KS 66701

Booster Pump Station Improvements
Renovation, Infrastructure
Bidding
$430,000 CJ est. value
Manhattan, KS 66502

Fairlane Commercial Center Water and Gas Utility Relocation
Infrastructure
Post-Bid
Louisburg, KS

Last Updated 08/09/2022 10:31 AM
Project Title

2022 Collection System Rehabilitation

Physical Address View project details and contacts
City, State (County) Holton, KS 66436   (Jackson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $432,662 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Major items of work include: Rehabilitant of sanitary sewer collection system including cleaning, videotaping and logging defects, prepping line to receive cured in place pipe (CIPP), sewage pump around as required, approximately 148 L.F. of 6" CIPP, 9,037 L.F. of 8" CIPP, 1,799 L.F. of 10" CIPP, 779 L.F. of 12" CIPP, 2 internal drop installations, traffic control, and appurtenances. Additive Areas: Rehabilitant of sanitary sewer collection system including cleaning, videotaping and logging defects, prepping line to receive cured in place pipe (CIPP), sewage pump around as required, approximately 1,579 L.F. of 8" CIPP, traffic control, and appurtenances. Bid security in the amount of 5 percent of the bid shall accompany each bid in accordance with Instructions to Bidders. Owner reserves the right to waive irregularities and to reject bids. No bidder may withdraw his bid within 60 days after the date of the opening thereof

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents