Similar Projects
Pavement Evaluations for Interstate Maintenance
Alteration
Bidding
$25,000 est. value

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Southern Region Disaster Recovery Support BPA
Results

Riverbend Park Grading, Drainage, and Paving
Results
Less than $2,145,081 est. value
Dalton, GA 30722

1.443 Miles of Widening and Reconstruction for Additional Turn Lanes on SR 40 Beginning West of Grove Blvd (CS 481) and Extending East to Truss Plant Rd (PR 718)
Results

LMIG Street Resurfacing
Results
College Park, GA 30337

T32-D6-PCC-Whitfield-115317
Results
GA

Richland Creek Reservoir Entrance
Results
Less than $289,298 est. value
Cartersville, GA 30120

2021 LMIG Project
Results
Mount Vernon, GA

Improvement of Hill Road between Eastbrook and Wagner Drive to Airport Road
Results
Dalton, GA 30721

Varnell Elementary School Paving
Results
Dalton, GA 30721

5.8 S Maple Grove Road at SR 71
Results
Dalton, GA 30721

2021 Milling and Resurfacing of Various City Streets
Infrastructure
Results
Dalton, GA

5.8 T Riverbend Road at SR 3 Improvements and Signal Modification
Infrastructure
Results
Dalton, GA 30721

Last Updated 03/18/2022 08:36 AM
Project Title

Tax Commissioner Parking Lot and New Road

Physical Address View project details and contacts
City, State (County) Dalton, GA   (Whitfield County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $225,898
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Whitfield County Tax Commissioner’s Office is looking to better serve the citizens of Whitfield County by increasing the number of parking spaces available to those visiting the facility, by thirty-six (36) spaces. Due to surrounding topography, and limited access, the construction will involve the construction of 122 feet of new road to access the proposed parking area. This road has been designed to conform with the City of Dalton road and street specifications, thus, all construction shall conform with all technical details shown on the complete construction plan set.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents