Similar Projects
Daves Creek Road Emergency Culvert
Infrastructure
Bidding
GA 30041

TSPLOST Project 1
Infrastructure
Bidding
Darien, GA

Church Street Trench Backfill and Resurfacing Improvements
Post-Bid
Palmetto, GA 30268

Midtown Greenway Extension - Stream Restoration Project
Post-Bid
Gainesville, GA 30501

Sweetwater Creek Rehabilitation - Phase 1
Results
Less than $2,022,280 est. value
East Point, GA

Claradon Avenue and Benning Drive Culvert Work
Results
Columbus, GA

Ditching of Savannah Disposal Areas
Term Contract
Bidding
$1,000,000 to $5,000,000 est. value
Savannah, GA 31401

Hanarry Point Drainage Improvement Project
Post-Bid
Lawrenceville, GA 30045

Detention Pond Rehabilitation/Reconstruction - 11 Sites
Results
Lawrenceville, GA 30046

Hub Transformation Project
Infrastructure
Bidding
Woodstock, GA

Repair of Storm Water Drainage Systems
Post-Bid
Snellville, GA 30078

Wilson Street Culvert Replacement
Results
Less than $85,000 est. value
Pelham, GA 31779

Shoals Street Drainage and Street Improvements
Infrastructure
Bidding
Warrenton, GA

2020 LMIG Projects
Post-Bid
Darien, GA 31305

Revetment Rehabilitation
Results
Brunswick, GA

Last Updated 07/01/2021 09:15 AM
Project Title

Linton Street Drainage Improvements

Physical Address View project details and contacts
City, State (County) Woodstock, GA   (Cherokee County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $50,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Woodstock, Georgia, herein referred to as the City, is accepting bids from qualified contractors for the purpose of providing drainage improvements via roadway elevation changes that include but are not limited to milling, curb and gutter, and asphalt topping along Linton Street to improve stormwater drainage, hereinafter referred to as the “PROJECT”. The work to be done consists of the furnishing of all materials, labor and equipment for the complete construction of the project.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents