Similar Projects
Watermark - Fort Collins
New Construction
Conception
$7,000,000 est. value
Fort Collins, CO 80521

6301 South College Avenue Residential
New Construction
Conception
Fort Collins, CO 80525

Montava
New Construction
Design
Fort Collins, CO 80522

Sanctuary on the Green (formerly known as Sanctuary West)
New Construction - 90,195 SF
Design
Fort Collins, CO 80521

South Taft Hill Road Mixed Use Development
New Construction - 19,500 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Fort Collins, CO

The Lakes at Centerra
New Construction
Pending Verification
Loveland, CO

Mulberry Development
New Construction - 100,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Fort Collins, CO 80524

Watermark at Spring Creek - Fort Collins
New Construction - 3,000 SF
Design
$500,000 to $1,000,000 CJ est. value
Fort Collins, CO

Prospect Road Units and Single Family Home
New Construction
Pending Verification
Fort Collins, CO 80526

Heart of the Rockies Christian Church (HRCC "Next Big Thing")
New Construction - 44,500 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Fort Collins, CO 80525

Aspen Knolls Third Subdivision and Aspen Knolls Addition
New Construction
Design
Loveland, CO 80537

Timnath Ranch Subdivision - 8th Filing
New Construction
Pending Verification
Timnath, CO 80547

Keystone Multifamily and Townhomes
New Construction - 289,982 SF
Conception
Fort Collins, CO 80528

South Howes Street Multi-Family
New Construction, Renovation - 11,700 SF
Design
Fort Collins, CO 80521

Ponderosa Ridge - Second Addition
New Construction
Pending Verification
Loveland, CO 80538

Last Updated 08/05/2021 06:27 AM
Project Title

Mountain Campus Modular Units

Physical Address View project details and contacts
City, State (County) Bellvue, CO 80512   (Larimer County)
Category(s) Residential
Sub-Category(s) Multi-Family Homes
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To provide and install several modular housing buildings including installation of trusses for porches at CSU’s Mountain Campus facility

Details

Multi-Family Homes, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents