Similar Projects
Triton Square
New Construction
Conception
$1,470,000 est. value
Groton, CT 06340

Triton Square
New Construction
Conception
$1,470,000 est. value
Groton, CT 06340

Colonel Ledyard School Redevelopment
Renovation - 61,134 SF
Design
Groton, CT

Village Apartments
New Construction
Design
Montville, CT 06382

New London Community Recreational Center
New Construction, Infrastructure - 57,000 SF
Bidding
$15,000,000 CJ est. value
New London, CT 06320

New Fire Station - Lisbon Fire Headquarters-REBID
New Construction, Infrastructure
Bidding
$9,500,000 CJ est. value
Lisbon, CT 06351

Community Center Court Resurfacing
Renovation
Post-Bid
Groton, CT

Groton Community Center Athletic Field
New Construction
Post-Bid
Groton, CT

4th District Voting Hall Drainage and Site Improvements
Results
Stonington, CT 06355

Reconstruction of Poquonnock Road
Infrastructure
Results
$2,244,530 est. value
Groton, CT

Thames River Apartments Redevelopment
New Construction, Demolition
Construction
$3,700,000 est. value
New London, CT 06320

Hale Mill Hotel
Renovation - 111,300 SF
Construction
Norwich, CT

Route 2 Apartments
New Construction
Pending Verification
$1,000,000 est. value
Pawcatuck, CT

Mystic River Bluffs (fka Mystic Education Center Redevelopment)
Build-out
Pending Verification
$35,000,000 CJ est. value
Stonington, CT 06355

Armstrong Tennis LED Lights and Parking Lot/Lights - City of Norwich
Renovation, Alteration
Conception
$195,000 est. value
Norwich, CT

Last Updated 12/13/2022 11:18 AM
Project Title

Shaw's Landing - Phase 2 and 3

Physical Address View project details and contacts
City, State (County) New London, CT 06320   (New London County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Park/Playground, Parking Garage, Paving/Reconstruction, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $65,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of two, five-story, buildings with a total of 173 units. Each building will be considered the next phase of a completed residential development. As of August 3, 2022, this project received site plan approval the New London Planning & Zoning Commission. No further building permits have been applied for. A general contractor has been selected. A firm construction timeline has not been provided.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Parking Space/Stalls, 116 Parking Spaces. 5 Stories Above Grade, Apartments, 173 Unit(s).
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Selective Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents