Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Place polyester concrete overlay
Infrastructure
Bidding
$2,050,000 est. value

AC Overlay Project SB1 2022 - Phase 4
Infrastructure
Bidding
$5,000,000 est. value
Sacramento, CA

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

AC Overlay Phase One
Infrastructure
Post-Bid
$7,900,000 est. value
Sacramento, CA

Upper Multi-Purpose Area Repairs and Improvements Kiefer Landfill
Infrastructure
Results
$225,000 est. value
Sloughhouse, CA 95683

Folsom Boulevard Complete Streets Phase 1
Infrastructure
Results
$5,400,000 est. value
Sacramento, CA

Elkhorn Boulevard Extension
Infrastructure
Bidding
$18,350,000 est. value
Sacramento, CA 95811

Cold Plane AC Pavement, Place HMA and Replace Concrete Slabs
Infrastructure, Alteration
Post-Bid
$4,860,000 est. value
CA

Hot Mix Asphalt (HMA) Concrete Grinder Dig Out Repair and Replacement Paving
Infrastructure
Results
CA

Ac Overlay Project Sb1 2022 - Phase 2
Infrastructure
Bidding
$6,600,000 est. value
CA

Power Inn Road Improvement Project
Infrastructure
Results
$3,208,000 est. value
Sacramento, CA 95811

Construction of Roadway Paving on Lytle Avenue from W. Cecil Way to County Line Road
Infrastructure
Results
$1,436,028 est. value
Delano, Sacramento, CA 95811

AC Overlay Phase Two
Infrastructure
Results
$6,800,000 est. value
Sacramento, CA

On Call Trench Repair Asphalt Paving Restoration
Infrastructure
Results
$650,000 est. value
Folsom, CA

Last Updated 02/14/2022 03:27 AM
Project Title

HMA Concrete Grinder Dig Out Repair and Replacement Paving

Physical Address View project details and contacts
City, State (County) CA   (Sacramento County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DVBE Goal - 3% Provide all labor, materials, supplies, tools, parts, incidentals, travel, traffic control, and equipment necessary to provide HMA concrete grinder dig out repair and replacement paving services for Caltrans District 03.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents