Similar Projects
Last Updated | 11/23/2022 04:06 PM |
Project Title | Fir Grove Elementary Roof |
Physical Address | View project details and contacts |
City, State (County) | Beaverton, OR 97008 (Washington County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $987,990 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The purpose of this Invitation to Bid is to obtain competitive bids for retaining a General Contractor (GC) to furnish, install, manage, and coordinate all the work for the Fir Grove Elementary Roof. Deadline for submitting requests for clarification, change, substitution, or solicitation protest is October 31, 2022 - 4:00 PM PST PURPOSE AND INTRODUCTION: This solicitation is for retaining a general contractor (GC) to furnish, install, manage and coordinate all work as shown in the attached documents on behalf of the Beaverton School District. The goal is to recover the existing Tremco BUR system with a single ply. The project is over most of the building, including the attached covered play area but not the barrel roof section or detached covered play. 2. BACKGROUND AND SCHOOL DESCRIPTION: This project is going to take place at Fir Grove Elementary, 6300 SW Wilson Avenue, Beaverton, Oregon 97008. 3. OPERATIONAL ATTRIBUTES: The District requires the project to be completed by over the duration of the summer vacation beginning June 26, 2023. See project milestones below for further information. Coordination with summer maintenance activities will be required. 4. GENERAL SCOPE OF WORK: Please refer to attached plans and specifications. It is intended that the Contractor provides a complete project and coordinates work with the District, Contractors and Consultants hired by the District, and all applicable agencies having authority. a. Work to include supplying, storing, and handling of all required materials. b. Work includes protection of neighboring finishes and replacement/repair of any damaged surfaces including but not limited to ceiling tiles, wall board, paint, insulation, concrete block, etc. c. Contractor shall provide all labor, materials, equipment, transportation, and other facilities and services as necessary and/or required to execute all of the Work. d. All work areas shall be cleaned of any construction debris on a daily basis. General Contractor is responsible for material removal and disposal. Upon completion of the project, the General Contractor is to provide final cleaning of all work installed, replaced or repaired including jobsite office. e. Carefully review specification of Division 7 and be prepared to submit a Moisture Mitigation Plan as part of your initial submittals shortly after contract execution. f. Prepare to submit product data for all roofing materials within 10 days of a fully executed contract and provide proof of ordered material within 30 days after the fully executed contract. District is amenable to paying for materials or a portion of the materials upon confirmation of order. g. Carefully review all documents for the site. Below is only a summary of the work. i Fir Grove's work is to recover the existing Tremco BUR system with a single ply. The project is over most of the building, including the attached covered play area but not the barrel roof section or detached covered play. |
||
Details | 70,400 SF.
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |