Similar Projects
Airport Terminal Roof Replacement
Renovation - 8,000 SF
Bidding
$200,000 CJ est. value
Klamath Falls, OR 97603

Sorosis Reservoir Roof Structure Modifications and Spot Coating
Renovation
Sub-Bidding
$900,000 CJ est. value
The Dalles, OR 97058

Baker Heritage Museum Roof Replacement
Renovation
Sub-Bidding
$400,000 CJ est. value
Baker City, OR 97814

Pdx Roof Repair
Alteration
Post-Bid
Portland, OR 97218

Charleston Marina Maintenance Shop Roof Replacement
Alteration
Post-Bid
Coos Bay, OR

Roof Restoration - Willamette Center Shelter
Alteration
Results
Portland, OR 97202

Marshfield High School North Stadium Reroof/Video Booth Remodel
Alteration
Results
Coos Bay, OR 97420

Mills School and Pelican School - Roof Repair Project
Alteration
Post-Bid
Klamath Falls, OR 97601

Powers Housing Solar Panel Removal & Roofing Replacement Project
Alteration
Results
Powers, OR 97466

Well One Membrane Roof, Overhead Doors, HVAC
Alteration
Post-Bid
Boardman, OR

St Helens Armory Re-Roofing
Alteration
Results
$190,000 to $210,000 est. value
Selma, OR

Henley Middle School - Partial Roof Replacement
Alteration
Post-Bid
Klamath Falls, OR 97603

Animal Services Roof and HVAC Replacement
Alteration
Results
$400,000 to $450,000 est. value
Troutdale, OR 97060

Yamhill Carlton HS Voluntary Seismic Strengthening
Alteration
Post-Bid
Yamhill, OR 97148

Portland International Airport Maintenance Building Roof Replacement
Alteration
Results
$850,000 est. value
Portland, OR 97218

Last Updated 11/23/2022 04:06 PM
Project Title

Fir Grove Elementary Roof

Physical Address View project details and contacts
City, State (County) Beaverton, OR 97008   (Washington County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $987,990 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this Invitation to Bid is to obtain competitive bids for retaining a General Contractor (GC) to furnish, install, manage, and coordinate all the work for the Fir Grove Elementary Roof. Deadline for submitting requests for clarification, change, substitution, or solicitation protest is October 31, 2022 - 4:00 PM PST PURPOSE AND INTRODUCTION: This solicitation is for retaining a general contractor (GC) to furnish, install, manage and coordinate all work as shown in the attached documents on behalf of the Beaverton School District. The goal is to recover the existing Tremco BUR system with a single ply. The project is over most of the building, including the attached covered play area but not the barrel roof section or detached covered play. 2. BACKGROUND AND SCHOOL DESCRIPTION: This project is going to take place at Fir Grove Elementary, 6300 SW Wilson Avenue, Beaverton, Oregon 97008. 3. OPERATIONAL ATTRIBUTES: The District requires the project to be completed by over the duration of the summer vacation beginning June 26, 2023. See project milestones below for further information. Coordination with summer maintenance activities will be required. 4. GENERAL SCOPE OF WORK: Please refer to attached plans and specifications. It is intended that the Contractor provides a complete project and coordinates work with the District, Contractors and Consultants hired by the District, and all applicable agencies having authority. a. Work to include supplying, storing, and handling of all required materials. b. Work includes protection of neighboring finishes and replacement/repair of any damaged surfaces including but not limited to ceiling tiles, wall board, paint, insulation, concrete block, etc. c. Contractor shall provide all labor, materials, equipment, transportation, and other facilities and services as necessary and/or required to execute all of the Work. d. All work areas shall be cleaned of any construction debris on a daily basis. General Contractor is responsible for material removal and disposal. Upon completion of the project, the General Contractor is to provide final cleaning of all work installed, replaced or repaired including jobsite office. e. Carefully review specification of Division 7 and be prepared to submit a Moisture Mitigation Plan as part of your initial submittals shortly after contract execution. f. Prepare to submit product data for all roofing materials within 10 days of a fully executed contract and provide proof of ordered material within 30 days after the fully executed contract. District is amenable to paying for materials or a portion of the materials upon confirmation of order. g. Carefully review all documents for the site. Below is only a summary of the work. i Fir Grove's work is to recover the existing Tremco BUR system with a single ply. The project is over most of the building, including the attached covered play area but not the barrel roof section or detached covered play.

Details

70,400 SF.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents