Similar Projects
NHCRWA State Highway 249 Regional Pump Station Project 24C
New Construction
Bidding
$85,000,000 to $95,000,000 est. value
TX

Park Vista at El Tesoro Lift Station Facilities
New Construction
Bidding
Houston, TX 77083

Golden Acres WWTP Influent Lift Station
Post-Bid
Pasadena, TX 77506

Booster Pump Replacement Project
Post-Bid
Bellaire, TX

Fountain View Regional LS Construction and Abandonment of Westheimer No. 1 LS
Results
$21,957,065 est. value
Houston, TX

Force Main R/R For Lift Stations
Results
Less than $10,229,101 est. value
Houston, TX 77000

Lift Station No. 8 Force Main Replacement
Infrastructure
Bidding
$279,815 est. value
The Woodlands, TX

Inspection, Maintenance, Repair and Related Items of Lift Station
Term Contract
Post-Bid
Less than $220,000 est. value
Houston, TX

Lift Stations No. 16, 17, 18, and 21 Improvements
Results
Clear Lake City, TX 77058

Lift Station No. 1 for Meritage Homes OBO
New Construction
Bidding
Baytown, TX 77523

Reclaimed Water Pump Station
New Construction
Post-Bid
$1,070,000 est. value
TX

Construction of Lift Station No. 2 Rehabilitation
Results
TX

Grease Trap and Lift Station Services
Infrastructure
Bidding
Pasadena, TX

Lift Station and Off-Site Utilities to Serve Villages of Pine Ridge
New Construction
Post-Bid
TX

Lift Station Renewal and Replacement
Results
Less than $5,035,965 est. value
Houston, TX 77000

Last Updated 07/23/2021 03:19 AM
Project Title

Lift Station Number 3 Rehabilitation

Physical Address View project details and contacts
City, State (County) TX   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the rehabilitation of an existing lift station including recoating of dry pit pumps and piping and wet well piping, replacement of air release valve and drain valve, and construction of 45 kW emergency power generator, ATS, and appurtenances. Scope also includes installation of bypass manhole on existing force main. (Key Map No. 372-P) .

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Packaged Generator Assemblies.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents