Similar Projects
2023 Roof Rehabilitation Wayzata High School Auditorium
Renovation
Sub-Bidding
$2,528,792 CJ est. value
Plymouth, MN 55446

2023 MSP Campus Building Roof Replacements
Infrastructure, Renovation
Sub-Bidding
$1,000,000 CJ est. value
Saint Paul, MN 55111

Albert Lea Ice Arena Reroof
Renovation
Post-Bid
$850,000 CJ est. value
Albert Lea, MN 56007

Winona State University - 2022-Memorial Hall Roof Replacement
Renovation
Post-Bid
$1,880,000 CJ est. value
Winona, MN 55987

2022 Folded Plate Repairs
Alteration
Results
MN

LEAP High School and Rondo-Capitol Hill Gym Floor Replacement
Alteration
Results
$296,000 est. value
Saint Paul, MN

Jie Ming Mandarin Immersion Addition and Renovation - Part 2 Bid Package #1: Roofing
Renovation
Construction
$300,000 CJ est. value
Saint Paul, MN 55116

HRA Roof Replacement at Rivers Edge
Renovation
Construction
$174,630 CJ est. value
Rochester, MN 55901

Soffit, Fascia Flashing, Gutter/Downspout Replacement, Roof Repair
Renovation
Sub-Bidding
$156,000 CJ est. value
Minneapolis, MN 55415

Raymie Johnson Townhomes Roof Replacement Project
Alteration
Post-Bid
$90,000 est. value
Oak Park Heights, MN

Lebanon Hills Campground Office Roof Replacement
Alteration
Results
$200,000 est. value
Apple Valley, MN 55124

Dover-Eyota High & Middle School Re-roofing Project
Renovation
Sub-Bidding
$950,000 CJ est. value
Eyota, MN 55934

Duluth Fisheries Office Roof Replacement
Alteration
Post-Bid
$200,000 est. value
Duluth, MN 55804

Roofing Replacement
Alteration
Results
$80,000 est. value
Buyck, MN 55771

Reroofing of City of Savage Post Office
Renovation
Post-Bid
$400,000 CJ est. value
Savage, MN 55378

Last Updated 10/16/2023 10:11 AM
Project Title

Rockford Elementary School 2024 Roof Replacement

Physical Address View project details and contacts
City, State (County) Rockford, MN 55373   (Wright County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $1,700,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

ICS Consulting, LLC would like to invite you to participate in the bidding process for this construction project by utilizing our Construction Project Management For General Information/Bidders List, please contact Raeann Wynn, Project Coordinator via e-mail at raeann.wynn@ics-builds.com or direct at 612-999-1566. For Technical Project Information, please contact Ekalath Sophaphanh, Project Manager via e-mail at ekalath.sophaphanh@ics-builds.com or direct at 612-223-6122. This project will consist of One Single Prime Contractor Estimated Value: $1.7 M Schedule: Work onsite to begin no later than June 10, 2024 with Substantial Completion August 16, 2024 Prevailing Wage: No Each Bidder must comply with the following requirements to reassure acknowledgment and recognition of their Bids: Bids must be accompanied by Bid security in the form of a certified check, cashier's check, or Bid bond in the amount of 5% of the base Bid submitted, made payable to the owner, as guarantee that Bidder will, if awarded, enter into contract in accordance with contract documents and submitted Bid. Submit Bid on the prescribed form, which is furnished with the specification, with full name and address of the Bidder. Completely fill in all blank spaces on the Bid Form, in ink or typewriter, in both words and figures. Sign in longhand, executed by a principal duly authorized to enter into an agreement. If a Bidder is a co-partnership, then signatures on the Bid shall be by an authorized member of the firm, with names and addresses of each member of partnership. Base Bid and all alternate Bids shall be stated both in writing and in figures. In all cases, written and numerical figures must agree; otherwise at Owner's option, it shall be cause for rejection of Bid. Complete form without alterations. Submit alternate prices (Bids) for either increasing or decreasing the costs, as called for on Bid form and Description of Alternates. Submit a Bid for all alternates. Owner may make such investigations as they deem necessary to determine the ability, competency, and responsibility of the Bidder to perform the work. Any Bidder shall furnish to Owner all such information and data for this purpose, as the Owner may request. Owner reserves the right to reject any Bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified to carry out the obligations of the contract and to complete the Work contemplated therein. The competence and responsibility of Bidder will be considered in making an award, including, but not limited to; (1) proof of financial responsibility, (2) quality of similar work, (3) amount of experience with similar projects, (4) facilities, personnel and equipment, (5) reputation for performance, and (6) the ability to complete the work within specified time. Owner reserves the right to reject any Bid where there is reasonable doubt as to the qualifications of the Bidder. Owner reserves the right to: (1) accept Bidders Base Bid only, (2) accept any one or more of bidders Alternate Bids, in any order regardless of the order in which they were listed, (3) reject all Bids, (4) award contract based on their investigation of Bidders, as well as acceptance of alternates, all of which the Owner deems to be in their best interest, (5) waive informalities or minor irregularities in Bids and waive minor irregularities or discrepancies in Bidding procedure. Upon award of Contract, Contractor shall provide AIA A312 Performance and Payment Bonds in the amount of 100% of Contract Sum in accordance with General Conditions and Amendments to General Conditions. Each Bidder (including subcontract Bidder where appropriate) is advised to visit the site and to fully inform themself and record their own investigations as to the extent of the Work, the extent of the work performed by other contractors under other construction packages, conditions under which the Work is to be performed, existing buildings and streets, conditions of the area, existing utilities and other features, available facilities and difficulties that may be encountered in connection therewith, and other relevant items which will affect their Bid or the Work. Prior to submitting a Bid, each Bidder is required to examine all of the bidding requirements, all Contract Documents, all drawings, and specifications for the Project (including those primarily for other Subcontracts). Contractors shall become thoroughly familiar with the scope of the Project and all factors and items of work which will affect their Bid or the Work, whether shown or specified in documents primarily for Work of others or Work of this Contract. No extras will be allowed the Contractor as a result of misunderstanding of the extent of scope of the Work as a result of their failure to study and record their own findings. Submission of a Bid shall be proof that such examinations have been made and that Bidder has recorded their own investigation and has become thoroughly familiar with all contract documents (including all addenda). The failure or omissions of any Bidder to examine any form, instrument or document shall in no way relieve any Bidder from any obligation in respect to their Bid. Nor shall it be the responsibility of ICS or its counterparts to ensure you have read all documentation. This is the sole responsibility of the Bidder and its Sub-Contractor(s). START DATE: Work will begin after receipt of the signed contract from the Owner. The anticipated award date is December 14, 2023. Pre-construction and submittals work related to the project is to commence immediately after receipt of the signed contract. The onsite work will begin on the premises no later than June 10, 2024, but portions of the reroofing could take place earlier. SUBSTANTIAL AND COMPLETION DATE: Owner requires all work to be substantially complete by August 16 ,2024.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents