Similar Projects
Finish Site Plan Work for New Marina Office
New Construction, Infrastructure
Conception
$116,643 CJ est. value
Islamorada, FL 33036

Sombrero Beach Sand Renourishment - City of Marathon
Infrastructure
Conception
$416,000 CJ est. value
Marathon, FL 33050

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Green Turtle Hammock Nature Preserve Improvements
New Construction, Infrastructure
Bidding
$5,077,870 CJ est. value
Islamorada, FL 33036

Green Turtle Hammock Nature Preserve Improvements
New Construction, Infrastructure
Bidding
$5,077,870 CJ est. value
Islamorada, FL 33036

interior modernization of our public housing units
Renovation
Post-Bid

Diesel Pump Upgrades at J. Robert Dean Water Treatment Plant
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Florida City, FL 33034

Asphalt and Sidewalk Rehabilitation
Infrastructure
Results

Key Largo Park Walking Path Asphalt Repair
Infrastructure
Results
Key Largo, FL 33037

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Sea Breeze Mobile Home and RV Park
New Construction, Build-Out - 25,974 SF
Construction
$1,000,000 est. value
Islamorada, FL 33036

Key West Bight Street Parking - City of Key West
Infrastructure
Conception
$2,210,946 CJ est. value
Key West Nas, FL 33040

Generator Building - Monroe County Sheriffs Office
New Construction, Infrastructure - 5,161 SF
Design
$1,000,000 CJ est. value
Key West Nas, FL 33040

Fishermen's Community Hospital - Medical Arts Building
New Construction, Infrastructure - 9,990 SF
Post-Bid
$3,000,000 CJ est. value
Marathon, FL 33050

Last Updated 07/20/2023 12:09 PM
Project Title

Duck Avenue Supportive Housing Development

Physical Address View project details and contacts
City, State (County) Key West Nas, FL 33040   (Monroe County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Parking Garage, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $40,600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the phased new construction of two buildings with 15 units each and the renovation of 1620 Truesdale Court and then the new construction of two buildings with a total of 71 units and a parking garage at 1615 1616, 1617, 1618 and 1620 Truesdale Court and 3401 Duck Avenue. Scope details have not been released. As of July 20, 2023 the project is in design stage and seeking development plan and conditional use from the City of Key West. The Development Review Committee discussed the project on June 22, 2023. The architect has been chosen. Information regarding the general contractor and method of selection has not been disclosed. The construction timeline has not been determined, but is not expected to begin before the summer of 2024.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

4 Stories Above Grade, New Construction, New Construction. 4 Stories Above Grade, New Construction, New Construction. 2 Stories Above Grade, Renovation, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents