Similar Projects
The Settlement
New Construction
Conception
Simpsonville, SC

O’Neal Village Expansion
New Construction - 15,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Greer, SC 29651

Pinestone
New Construction - 77,000 SF
Design
Travelers Rest, SC

Pinestone
New Construction - 77,000 SF
Design
Travelers Rest, SC

Code Enforcement Abatement
Bidding
Greer, SC

Mauldin Center Apartments
New Construction - 50,000 SF
Sub-Bidding
Mauldin, SC

Gibbs Shoals Apartment Complex
New Construction
Post-Bid
Greer, SC

Site and Dwelling Unit Improvements
Post-Bid
Blacksburg, Calhoun Falls, Clover, Fort Mill, Iva, Landrum, McCormick, York, SC 29360

Construction of Two Residences
New Construction
Results
Greenville, SC

New Construction at 102 Heatherly Drive
New Construction
Results
Less than $89,200 est. value
Greenville, SC 29611

Falls Tower
New Construction
Construction
$16,000,000 est. value
Greenville, SC

Woodside Mill Apartments
Renovation, Addition
Construction
Greenville, SC 29611

Ashe Downs
New Construction
Pending Verification
Fort Mill, SC 29715

Pelham Road Development
New Construction
Pending Verification
Greenville, SC 29601

Aspens Senior Living
New Construction
Conception
Greenville, SC

Last Updated 03/05/2021 10:28 AM
Project Title

The Mosaic at West End

Physical Address View project details and contacts
City, State (County) Greenville, SC 29169   (Greenville County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums, Single-Family Homes
Contracting Method
Project Status Obtained from a News Source
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mixed Use.

Details

Single-Family Homes, New Construction, Apartments/Condominiums.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents