Similar Projects
St. Catherine of Siena Parish Classroom Addition
Addition - 2,640 SF
Construction
Manchester, NH 03104

Construction Management Services - Mt. Lebanon School Renovation Project
New Construction, Renovation - 6,500 SF
Results
$2,800,000 est. value
Lebanon, NH 03784

New Secure Entry and Possible Handicapped Accessibility Renovation Project
Renovation, Infrastructure
Post-Bid
$1,500,000 CJ est. value
Monroe, NH 03771

Woodman Area Infrastructure Improvements
Renovation
Results
Rochester, NH

SAU 66 - Renovation Project
Renovation
Post-Bid
Hopkinton, NH 03229

Mount Lebanon Elementary School Renovations - Lebanon School District
Renovation - 9,800 SF
Post-Bid
$4,000,000 est. value
Lebanon, NH 03784

RFP - Acquisition and Development of Hallsville School
Renovation, Infrastructure
Post-Bid
$1,200,000 CJ est. value
Manchester, NH 03103

Allenstown Elementary and Middle School
New Construction - 83,000 SF
Post-Bid
$32,500,000 est. value
Allenstown, NH 03275

Main Dunstable Elementary School Renovation - City Of Nashua
Renovation
Conception
$11,292,877 est. value
Nashua, NH 03062

Birch Hill Elementary School Renovation - City of Nashua
Renovation
Conception
$11,550,474 CJ est. value
Nashua, NH 03063

RFQ Construction Manager - Gale School Belmont, New Hampshire
Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$280,000 CJ est. value
Belmont, NH 03220

Lonodergan Hall Renovation
Renovation
Post-Bid
$1,222,300 CJ est. value
Concord, NH 03301

Maple Wood - HVAC Upgrades - City of Somersworth
Renovation
Conception
$831,159 CJ est. value
Somersworth, NH 03878

Rochester School District - Fire Resistant File Cabinets
Renovation
Bidding
Rochester, NH 03867

Last Updated 11/28/2022 01:11 PM
Project Title

PRESS - Dondero Elementary Schools - City of Portsmouth

Physical Address View project details and contacts
City, State (County) Portsmouth, NH 03801   (Rockingham County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Design Development
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Portsmouth plans Community Campus renovations for Lister Academy. Here's expected cost. PORTSMOUTH -- City school district leaders are estimating the cost to renovate the Community Campus building to make way for the Robert J. Lister Academy in the near future will be $3.5 million to $4 million. Portsmouth School Board members were briefed Tuesday on the city alternative high school program's eventual move to the expansive Community Campus, which the city purchased for $10 million. Lister Academy will vacate the old Sherburne School building. School Board chairperson Nancy Clayburgh said SAU 52 already has $1.5 million in funding for a window repair project at Dondero and Little Harbour elementary schools, which was designated to the district from the city's capital improvement planning. The school district will move that allocation over to pay for the renovations to the Community Campus. To pay for the window repairs at the two elementary schools, the district will now contribute $1.5 million from its Elementary and Secondary School Emergency Relief funding from the American Rescue Plan Act. The school department is requesting $2 million from the city's fiscal year 2024 capital improvement planning to cover the remainder of estimated costs to renovate the Community Campus. The City Council would need to approve the funding request. Why Portsmouth is inspecting homesand all properties: Data collection process explained. "But everyone feels confident that they will approve that because the city obviously has a deep interest in the Sherburne School building," Clayburgh said. Vision for Lister Academy's new home The district's business administrator, Nathan Lunney, addressed a discrepancy between the estimated total cost of renovations versus the request made to the city for additional funding. At the Community Campus, the Robert J. Lister Academy will have roughly 12,000 square feet of space. Lunney stated that "not every square foot costs as much as every other square foot" and believes the full cost of renovations could come to $3.6 million, though the city is waiting on a final figure from city-based JSA Architects. In Portsmouth:Cross Roads House marks 40 years of helping people without shelter. Need is still growing. "I'm resolved that we should make sure we move our students into a great place like we did when we moved kids back into Dondero and Little Harbour and the like," he said. "It should be a contemporary learning space. I'm not convinced we need $4 million. We don't need the Cadillac, some of the things we can adjust." Working with JSA Architects, SAU 52 administrators and Robert J. Lister Academy staff produced a space needs analysis to pinpoint what the program's layout at the 72,000-square-foot Community Campus would look like. A concept design shows five main classroom spaces for science, math, English, social studies, and art and construction. The design also calls for a multipurpose room, a teaching kitchen, tutor and counseling space, staff offices, a student lounge and storage space. "It more or less reproduces a lot of the spaces already existing in Lister (Academy)," Superintendent Zach McLaughlin said. "There's not a lot of new in here. There's a lot of re-creation of what they already have but in nicer facilities." Will affordable housing come to old Sherburne School Once Robert J. Lister Academy, a program started in 1992 with a typical enrollment of upwards of 30 students, moves to the Community Campus, the long-term goal for the city is to convert the building into affordable housing units, according to Clayburgh. "We feel that these funds are all going to be there for us to make this project happen," she added. Helping Seacoast schools:Miracles from Mimi honors late mom's legacy. Clayburgh said the district is looking at potentially moving the program to the Community Campus in January 2024 after funding is approved and renovations are complete. "The kids will be so thrilled to go to a new space," said School Board member Ann Walker. "They'll adjust easily." The School Board will hold a site walk of the Robert J. Lister Academy's intended space at the Community Campus on Dec. 20.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents