Similar Projects
South West 209th Avenue Kinnaman Road to Alexander Street 36-Inch PVC Pipe
Infrastructure
Post-Bid
$150,000 to $200,000 est. value
Aloha, OR 97007

North Pipeline Lateral N1 Relocation at NorthWest Martin Road and Highway 47 for Tualatin Valley Irrigation District
Infrastructure
Results
$25,000 to $100,000 est. value
Forest Grove, OR 97116

Water Transmission Pipeline
Infrastructure
Post-Bid
$15,000,000 to $20,000,000 est. value
Sherwood, OR 97140

Aloha INN PSH Civil Work
Infrastructure
Results
$65,000 est. value
Hillsboro, OR

SW Roy Rogers Road - Chicken Creek to SW Borchers Dr
Alteration
Results
$15,000,000 to $20,000,000 est. value
OR

SW 209th Avenue SW Kinnaman Road - SW Alexander Street
Infrastructure, Alteration
Results
$15,000,000 to $25,000,000 est. value
Aloha, OR 97007

Construction of ODOT Ada Ramps Water Structures Relocation
Alteration
Results
$75,000 to $115,000 est. value
Beaverton, OR

Plastic Drainage Pipe
Term Contract, Alteration
Results
$150,000 est. value
OR

2022 Re-Pipe
Infrastructure
Results
$800,000 est. value
Beaverton, OR 97007

URMD SI 192nd Av - TV Hwy-Trelane St
Demolition, Alteration
Results
$550,000 to $750,000 est. value
OR

Pipeline Construction
Infrastructure
Post-Bid
$400,000 est. value
Beaverton, OR

Expand the Existing Raw Water Facilities to an Initial Willamette Water Supply System
Infrastructure
Post-Bid
$15,270,000 est. value
Beaverton, OR

Locating and Marking Services of Underground Facilities
Infrastructure
Post-Bid
Hillsboro, OR 97124

Public Improvement Fir Grove Loop Large Meter Replacement
Infrastructure
Bidding
$100,001 to $1,000,000 est. value
Hillsboro, OR

Large Meter Replacement Public Improvement ITB
Infrastructure
Bidding
$50,001 to $100,000 est. value
Hillsboro, OR

Reported 07/19/2022 03:29 PM
Project Title

Alyssum and Twinflower Storm Line Replacement - City of Forest Grove

Physical Address View project details and contacts
City, State (County) Forest Grove, OR 97116   (Washington County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Forest Grove, Oregon. Conceptual plans call for site work for a water / sewer project. Replace exisng 12, 18, and 21 inch storm line with 24 inch, as exisng system goes from 24" to 12inch, 18", and 21" before going to 24". Project to be verified by upcoming SWM Master Plan As of July 18, 2022, this project is currently in the FY 2023 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents