Similar Projects
The Haven Residential Development
New Construction, Infrastructure
Conception
$24,000,000 CJ est. value
Omaha, NE 68022

2022 Bond - City of Omaha
Infrastructure
Conception
$79,600,000 CJ est. value
Omaha, NE 68102

Kiewit Corporation Headquarters / Omaha
New Construction, Infrastructure - 200,000 SF
Design
$76,000,000 CJ est. value
Omaha, NE 68118

Midwest Surgery Hospital / Omaha
Addition, Infrastructure - 6,794 SF
Design
$3,155,083 CJ est. value
Omaha, NE 68114

WP-4 Reservoir and Associated Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Omaha, NE 68102

Grover Street - 50th to 60th Streets
Infrastructure
Bidding
$3,000,000 CJ est. value
Omaha, NE 68124

Burger Detour
New Construction, Infrastructure - 2,258 SF
Sub-Bidding
$1,500,000 CJ est. value
Omaha, NE 68022

UNO Roskens Hall Stem Trail Center Renovation BP #1 - Demolition, Fire Suppression and Early MEP Package
Demolition, Renovation, Infrastructure
Sub-Bidding
$4,063,808 CJ est. value
Omaha, NE 68182

District 2 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

S 156th Street and Internal - Sanitary, Storm Sewer & Paving
Infrastructure
Post-Bid
$300,000 CJ est. value
Omaha, NE 68102

Papio Creek Intake Damper Replacement
Infrastructure
Results
$915,000 CJ est. value
Bellevue, NE 68123

Water System - Section II
Infrastructure
Results
$509,389 CJ est. value
Omaha, NE 68102

Costco Wholesale Off-Site Parking Lot / Omaha
Infrastructure - 153,409 SF
Construction
$200,000 CJ est. value
Omaha, NE 68154

Community Alliance Office
New Construction, Infrastructure - 120,000 SF
Construction
$60,000,000 CJ est. value
Omaha, NE 68106

Omaha Civic Auditorium Redevelopment
Infrastructure, Renovation
Pending Verification
$102,000,000 CJ est. value
Omaha, NE 68102

Last Updated 12/09/2022 12:35 PM
Project Title

Terminal Entrance Drive Expansion, Phase 3

Physical Address View project details and contacts
City, State (County) Omaha, NE 68110   (Douglas County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Airline/Passenger Terminal, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing All Labor, Materials and Equipment and Performing All Work Necessary for Construction of Terminal Entrance Drive Expansion, Phase 3, Aip The Anticipated Work Includes Reconstruction of the Airport Front Drive Adjacent to the Airport Terminal and Also Includes the Construction of a Canopy Between the Terminal and the South Parking Garage Along the Length of the Terminal. Prequalification of Bidders. Contractors Must Be Prequalified in Order to Submit Bids on This Project. Contractors Which Meet the Following Requirements Shall Be Considered as Prequalified to Submit a Bid for This Project: The General Contractor Must Have Been in Business for More Than Five (5) Years Doing Similar Work. Each Proposal Must Be Accompanied by a Bid Guaranty in the Amount of Five (5) Percent of the Total Amount of the Bid. The Bid Guaranty May Be by Certified Check or Bid Bond Made Payable to Omaha Airport Authority. The Successful Bidder Will Be Required to Furnish Separate Performance and Payment Bonds- Each Equal to One Hundred Percent (100%) of the Contract. Bids May Be Held by the Omaha Airport Authority Until 45 Days After the Bid Opening Date for the Purpose of Evaluating Bids Prior to Award of Contract. The Successful Bidder Will Have to Work Adjacent to the Security Controlled Area of the Airport. An Unlawful Entry to Secured Parts of the Airport is a Criminal Offense. Prospective Bidders Need to Be Aware of This Requirement in Bidding This Project. The Right is Reserved by the Omaha Airport Authority to Delay or Cancel the Bid Opening, to Reject Any and All Bids, and to Waive Any Informality in the Bids Received. Only Prequalified Bidders Bids Will Be Opened. The Successful Bidder Will Be Required to Submit a Certification of Non-segregated Facilities and to Notify Perspective Subcontractors of the Requirements for Such Certification Where the Subcontract Exceeds $10,000. This Project is Subject to the Requirements of the Davis-bacon Act, as Amended. The Contractor is Required to Comply With Wage and Labor Provisions and to Pay Minimum Wages in Accordance With the Schedule of Wage Rates Established by the United States Department of Labor. This Project is Subject to the Requirements of 49 Cfr Part 26 Disadvantaged Business Enterprise Participation. The Owner Has Established a Contract Goal of 3.50 Percent Participation for Small Business Concerns Owned and Controlled by Qualified Disadvantaged Business Enterprises (Dbe). The Bidder Shall Make and Document Good Faith Efforts, as Defined in Appendix a of 49 Cfr Part 26, to Meet the Established Goal. Title Vi Solicitation Notice: the Omaha Airport Authority, in Accordance With the Provisions of Title Vi of the Civil Rights Act of 1964 (78 Stat. 252, 42 Usc 2000d to 2000d-4) and the Regulations, Hereby Notifies All Bidders or Offerors That It Will Affirmatively Ensure That Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full and Fair Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, or National Origin in Consideration for an Award. Award of Contract is Also Subject to the Following Federal Provisions: Buy American Preference (Reference: 49 Usc 50101) Civil Rights -- Title Vi Assurances Foreign Trade Restriction (Reference: 49 Cfr Part 30) Davis Bacon (Reference: 2 Cfr 200 Appendix Ii(D)) Affirmative Action (Reference: 41 Cfr Part 60-4, Executive Order 11246) Government Wide Debarment and Suspension (Reference: 2 Cfr Part 180 (Subpart C), 2 Cfr Part 1200, Dot Order 4200.5 Dot Suspension & Debarment Procedures & Ineligibility) Government Wide Requirements for Drug-free Workplace (Dot Regulation 49 Cfr Part 29) Lobbying and Influencing Federal Employees (Reference: 31 Usc 1352 Byrd Anti-lobbying Amendment, 2 Cfr Part 200 Appendix Ii(J), 49 Cfr Part 20 Appendix a) Procurement of Recovered Materials (Reference: 2 Cfr 200.322, 40 Cfr Part 247, Solid Waste Disposal Act)

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents