Similar Projects
Last Updated | 05/24/2023 10:08 AM |
Project Title | SOF Advanced Skills Training Facility Annex and HAZMAT Facilities - Revised Pricing |
Physical Address | View project details and contacts |
City, State (County) | Fort Bragg, NC 28310 (Cumberland County) |
Category(s) | Government/Public, Green Building, Heavy and Highway |
Sub-Category(s) | LEED Certified, Military Facility, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $26,159,884 [brand] Estimate |
Plans Available from | Plan Holders |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | AS of May 12, 2023, the project has been awarded. A timeline for construction has not been confirmed. Award Details Contract Award Date: May 12, 2023 Contract Award Number: W912PM23C0011 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: QXNSEJFDC1K3 Contractor Awarded Name: ACC Construction Co., Inc. Contractor Awarded Address: Augusta, GA 30907-3679 USA Base and All Options Value (Total Contract Value): $26,159,884.00 Project number - CHI-2 2017957-A0 The work and all incidental related work shall include the following: Construction of a single-story Technical Support Training Annex, gross area of 24,045 SF, with functional space to include administrative offices, classrooms, conference room, lounge area, instructional labs, classrooms, ADA-compliant restrooms for both students and instructors as well as locker rooms and showers, storage and supply space, secured storage for high-value technical equipment, a large garage area with vehicle lifts, support rooms for secured communications, and open office areas for instructor offices. Built-in building systems shall include fire alarm/mass notification, fire suppression, energy management controls, telephone, advanced unclassified and classified communications networks, cable television, intrusion detection, closed circuit surveillance, electronic access control, custom exhaust systems and equipment for lab instruction. Sustainable construction features shall be designed to comply with Leadership in Energy and Environmental Design (LEED) Silver level under v3.0 (2009) rating system. Since the "sunset period" for LEED v3.0 (2009) has now expired, the project documents have been tailored to achieve the equivalent Certified level under the LEED v4 BD+C for New Construction rating system; however, the project is not pursuing formal registration or certification under LEED. Supporting facilities shall include site preparation, utilities (electrical, water, sanitary sewer, natural gas, chilled water, information systems), lighting, vehicle parking, access drives and roads, curb and gutter, sidewalks, storm drainage, landscaping, and other site improvements. Special construction includes a controlled access area, accessible raised floor system. Comprehensive interior design and audio visual services are included. Also associated with this facility is a separate prefabricated Hazardous Material Storage building containing approximately 1,200 SF of enclosed area and 350 SF of open storage area. Access for persons with disabilities shall be provided. Heating and air conditioning shall be provided. Addendum #1-#5 have been issued as of 4-21-2023. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information. |
||||||||||||||||||||||||||||||||||||
Details | 1 Story Above Grade, 24,045 SF.
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |