Similar Projects
Last Updated | 07/13/2023 01:15 PM |
Project Title | Franklin Street Sewer and Manhole Replacements |
Physical Address | View project details and contacts |
City, State (County) | Evansville, IN 47711 (Vanderburgh County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,964,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work for which bids will be received includes approximately 150 linear feet of 72-inch HOBAS, a manhole and a HOBAS bend will be open cut replaced. The work includes excavation through the bedding material, backfilling with suitable bedding material to support the new infrastructure, and filling with the required Indiana materials for roadway construction. The work will also require bypass pumping of combined sewer flows for the duration of the project, dewatering of groundwater through the work site, and traffic control. Work shall also include all supervision, equipment, traffic control, granular backfill, pavement restoration (milling included), flushing, disinfecting, testing and all appurtenances necessary to complete the work shown in the Drawings and Specifications. All work must be ready for satisfactory and continuous operation, in accordance with the Drawings and Specifications. The above referenced project description includes items that are part of the Itemized Base Bid. The Contractor shall be responsible for all work shown on the plans and described in the specifications pertaining to the Itemized Base Bid, regardless of the installation method chosen. The Evansville Water and Sewer Utility further reserves the right to waive informalities, and to award the contract to the lowest and most responsible bidder (or bidders), all to the advantage of the Evansville Water and Sewer Utility, or to reject all Proposals. Final questions to be submitted by Tuesday May 2nd , 2023, to John Huston, John.Huston@arcadis.com The Work will be substantially completed within 270 calendar days |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |