Reported | 11/05/2021 12:00 AM |
Project Title | Biosolids Dewatering and Lift Station Improvement |
Physical Address | View project details and contacts |
City, State (County) | Twisp, WA (Okanogan County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Sewage Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project includes construction of the Screw Press Dewatering Addition, Lift Station No.2 Improvement’s, and Pre-Engineered Metal Building. Major elements of work generally include Biosolids Dewatering Lift Station Improvements. Project Estimate Schedule A – $906,695.00; Schedule B – $454,000.00 The work generally consists of the following elements: • Construction of an approximate 1150 sf cmu and/or wood frame addition to the existing dewatering building for biosolids storage. Addition includes under slab piping, and electrical improvements • Removal of existing dewatering equipment including associated pumps, piping, concrete supports, electrical and controls • Installation of new Owner Furnished Contractor Installed (OFCI) mechanical dewatering equipment package – OFCI equipment package includes mechanical dewatering equipment, shaftless screw conveyors, polymer mix and injection system, and electrical and controls panels. Installation includes some exposed and below slab piping modification • Removal of existing polymer injection system and associated piping and controls. • Replacing existing non-potable water piping, and installation of vfd for existing pumps, reinstallation of existing chemical injection pumps, new flow pacing flow meters, controls and appurtenances. Schedule B: Lift Station No.2 Improvements The work generally consists of the following elements: • Temporary bypass pumping of wastewater for the duration of construction • Abandon and demolish an existing underground generator structure including salvage of existing equipment • Removal of existing electrical panels and equipment, pumps, piping and valves from an existing underground drywell pump structure, including salvage of existing equipment • Installation of new pump system, equipment, piping and valves inside an existing underground drywell pump structure • Associated electrical improvements and backup generator. • Construction of an approximate 345 sf masonry and wood frame structure to house the pump station electrical power and control panels, water supply and emergency standby generator • Site improvements including replacement of existing chain link fence, double leaf gate, storm drainage drywell and swale, site grading, hydroseeding and gravel surfacing |
||||||||||||||||||
Details | Lift and Pump Stations, Renovation, Sewage Treatment Plant, Renovation.
|
||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |