Similar Projects
East Miller Road Expansion - City of Republic
Infrastructure
Conception
Less than $1,000,000 est. value
Republic, MO 65738

MM Five Lane Part 3 - City of Republic
Infrastructure
Conception
$4,000,000 est. value
Republic, MO

South Lone Pine Mixed Use
New Construction, Infrastructure - 132,600 SF
Design
$35,000,000 CJ est. value
Springfield, MO 65804

South Lone Pine Mixed Use
New Construction, Infrastructure - 132,600 SF
Design
$35,000,000 CJ est. value
Springfield, MO 65804

Group 6 Public Sewer Rehabilitation - Sewer Main Cleaning, CCTV and Cured-in-Place Pipe (CIPP)
Infrastructure
Bidding
$200,000 CJ est. value
Springfield, MO 65806

Irrigation System Maintenance, Repair, Testing, and New Installation
Infrastructure
Bidding
$280,000 CJ est. value
Springfield, MO 65806

Aquatic Center Parking Lot Asphalt and Curb Maintenance
Infrastructure, Alteration
Post-Bid
Willard, MO 65781

Aquatic Center Parking Lot Asphalt and Curb Maintenance
Infrastructure, Alteration
Post-Bid
Willard, MO 65781

Arterial Street ADA Ramp
Infrastructure
Results
Springfield, MO

Kansas Expressway Extension Phase I
Infrastructure
Results
Springfield, MO

Element By Westin - Marriott / Springfield
New Construction, Infrastructure - 71,477 SF
Construction
$22,000,000 CJ est. value
Springfield, MO 65807

Buc-ee's / Springfield
New Construction, Infrastructure - 53,000 SF
Construction
$28,000,000 CJ est. value
Springfield, MO 65803

Simply Smart Self-Storage Facility
New Construction, Infrastructure - 55,500 SF
Pending Verification
$6,000,000 CJ est. value
Republic, MO 65619

OZMOD 425
Demolition, New Construction, Infrastructure - 37,533 SF
Pending Verification
$10,500,000 CJ est. value
Springfield, MO 65803

MM Five Lane Part 2 - City of Republic
Infrastructure
Conception
$3,200,000 est. value
Republic, MO

Last Updated 05/03/2023 08:11 AM
Project Title

Route 13 Greene county Grading and Pavement

Physical Address View project details and contacts
City, State (County) Willard, MO 65770   (Greene County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $13,325,352 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Contract I.D. 230317-G04 FEDERAL PROJECT NUMBER(S): FAF13-2(93) FAF 13-2 (92) FAF 13-2 (90) FAF 13-2 (91) ****(1): Job J8P3087E Route 13 GREENE County. Grading and pavement at Sunset St. in Springfield, the total length of improvement being 0.286 miles. ****(2): Job J8P3087F Route 13 GREENE County. Grading and pavement at Walnut Lawn St. in Springfield, the total length of improvement being 0.217 miles. ****(3): Job J8S3165 Route 13 GREENE County. Resurface from Norton St. to Route 60 in Springfield, the total length of improvement being 7.87 miles. ****(4): Job J8S3173 Route 13 GREENE County. ADA improvement at various locations on Kansas Expressway from I-44 to Route 60 (James River Freeway) in Springfield, the total length of improvement being 7.83 miles. All questions concerning this project during the bidding process shall be forwarded to the project contact listed below Warner Bud Sherman, P.E. Transportation Project Manager Missouri Department of Transportation, Southwest District 3025 East Kearney Springfield, MO 65803 Telephone Number: (417) 895-7690 Email: bud.sherman@modot.mo.gov All questions concerning the bid document preparation can be directed to the Central Office Design at (573) 751-2876 (A) DBE Contract Goal: By submitting this bid, the bidder certifies that the bidder is familiar with the DBE Program Requirements in the General Provisions. The contract goal for the amount of work to be awarded is 6.00 % Range: 7.5M to 10M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Contract Time: 11/1/24

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents