Similar Projects
EV Charging Station Provider
Renovation, Infrastructure
Sub-Bidding
$100,000 CJ est. value
Santa Monica, CA 90401

Communication and Signal Systems Instalation Services
Term Contract
Sub-Bidding
Los Angeles, CA 90012

Conduit Infrastructure For Wi-Fi Expansion
Infrastructure
Post-Bid
Los Angeles, CA 90081

2001 North Garey Avenue Power Upgrade
Infrastructure
Post-Bid
Walnut, CA 91789

New 400-Amp Panel for Future Electric Vehicle Charging Stations, and Concrete Pad for Edison's Surface Mounted Transformer & Required Conduits
Alteration
Results
Torrance, CA 90504

Low Voltage and Network Cabling
Alteration
Results
Torrance, CA 90503

Category 2 - Internal Connections - Cabling
Renovation
Sub-Bidding
$80,000 CJ est. value
San Gabriel, CA 91776

Building D 2nd Floor Labs Mechanical System Upgrades
Alteration
Post-Bid
$600,000 est. value
Long Beach, CA 90808

North Long Beach Collection Main Control Valve Upgrade
Infrastructure
Results
$1,116,000 est. value
Long Beach, CA 90899

Electric Service Upgrade at Five School Sites
Renovation, Infrastructure
Post-Bid
Whittier, CA 90603

Electrical System Repair Services
Alteration
Results
CA

Led Lighting Retrofit
Alteration
Post-Bid
Los Angeles, CA 90007

Electrical System Repair Services
Alteration
Results
CA

Electric Vehicle Charging Station Solutions
Infrastructure
Post-Bid
Carson, CA 90745

Electrical System Repair Services in Los Angeles ,Ventura ,and Kern Counties
Alteration
Results

Last Updated 01/26/2023 06:32 PM
Project Title

Tweedy Boulevard Traffic Signal Synchronization Project

Physical Address View project details and contacts
City, State (County) South Gate, CA 90280   (Los Angeles County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,833,198 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed shall include, but not be limited to: traffic signal conduit installation; traffic signal pull box replacements and new installations; traffic signal fiber optic interconnect installation; new traffic signal controller installation; new traffic signal cabinet installation on new foundation(s); CCTV camera installation; Ethernet switch installation; Video Detection System (VDS) installation, and other items not mentioned here, but are required by the Technical Provisions Project Duration: 100 Work Days Pre-Qualification for Bidders: Not Required

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents