Similar Projects
Douglas County Fire Station 11 - Parking And Access Improvements
Infrastructure
Bidding
$175,000 CJ est. value
Douglasville, GA 30134

Access Control Upgrade
Renovation
Bidding
$460,000 CJ est. value
College Park, GA 30337

Asphaltic Concrete Supply Services
Term Contract
Sub-Bidding
Riverdale, GA 30274

Julian Smith Barbeque Pit Renovations - Rebid
Renovation
Post-Bid
$2,354,000 CJ est. value
Augusta, GA 30904

Splash Pad Concrete Additions
Addition, Alteration
Post-Bid
Perry, GA 31069

North Transfer Station Loading Dock and Endwall Frame Modification
Alteration
Results
Chamblee, GA 30341

Tactical Driving Course & Fire Training Ground - Clearing, Grading and Paving
Infrastructure
Results
$3,927,170 CJ est. value
Jonesboro, GA 30238

Poured In Place Concrete Maintenance
Alteration
Post-Bid
Suwanee, GA

2022 Concrete Repair Project 2
Alteration
Results
Johns Creek, GA

Annual Concrete Work
Term Contract
Post-Bid
Douglas, GA

On-Call Contract Shotcrete and Restorative Services for the Stormwater Department
Term Contract
Results
GA

Concrete Material Bay Storage
Alteration
Post-Bid
Villa Rica, GA

Annual Contract - Miscellaneous Concrete Projects at Various County Parks
Term Contract
Results
GA

Concrete Redi-Mix, Sand And Mortar
Alteration
Post-Bid
GA 30506

Exhibit Halls A and B Concrete Repair
Term Contract
Results
$400,000 est. value
Atlanta, GA 30313

Last Updated 05/02/2023 07:33 PM
Project Title

2023 Asphalt Road Resurfacing Services

Physical Address View project details and contacts
City, State (County) East Ellijay, GA 30540   (Gilmer County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $3,569,517 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

2023 Asphalt Road Resurfacing Services as described below: The roads for repaving are: o CR-0 Spring Drive beginning at Sassafras Road going down the hill and ending at Spring Drive, .10 mile o CR-116 Hudson Martin Road beginning at Rackley Road and ending at Mail Box 597, .30 mile o CR-19 Leonard Evans Road beginning at Old Tails Creek Road and ending at Roberts Ridge Road, .63 mile o CR-130 Parker Drive beginning at Roy Road and ending at Tickanetley Road, .70 mile o CR-130 Tickanetley Road beginning at Parker Drive and ending at Old Bucktown Road, 1.0 mile o CR-193 Yukon Road beginning at East Ellijay City Limits and ending at Pickens County Line, 8.40 miles The asphalt will be 12.55 mm Superpave. The work consists of furnishing labor, materials, equipment and Bituminous Material (Tach) and performing all work in accordance with the Georgia Department of Transportation Standard Specifications, 2001 Editions as amended by supplemental specifications and contract provisions

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents