Similar Projects
Barker East Well Replacement Drilling
Infrastructure
Design
$2,000,000 CJ est. value
Taylorsville, UT 84123

300 South / Multi-family and Commercial
New Construction, Infrastructure
Design
$17,000,000 CJ est. value
Salt Lake City, UT 84101

CTIHB Humanities Student Success Hub
Demolition, New Construction, Renovation, Infrastructure - 4,587 SF
Bidding
$470,000 CJ est. value
Salt Lake City, UT 84111

RFP Construction Manager - Lone Peak Wildland Fire Facility Relocation
Demolition, New Construction, Infrastructure
Bidding
$13,800,000 CJ est. value
South Salt Lake, UT 84119

SLC Airport PCC Pavement Joint Seal Program - Deicing Pad Taxiway
Post-Bid
Salt Lake City, UT

650 S Construction Trax Platform
Post-Bid
$1,750,000 to $2,000,000 est. value
Salt Lake City, UT

On-Call Transit Infrastructure Construction, Maintenance and Repair
Term Contract
Results
Less than $5,000,000 est. value
Salt Lake City, UT

3900 South 700 East to Jordan River Overlay
Results
Salt Lake City, UT

At 2100 Apartments II
New Construction, Infrastructure
Pending Verification
$60,000,000 CJ est. value
Salt Lake City, UT 84115

At 2100 Apartments II
New Construction, Infrastructure
Pending Verification
$60,000,000 CJ est. value
Salt Lake City, UT 84115

Westland Playground Pit Upgrade
Infrastructure
Bidding
$150,000 CJ est. value
West Jordan, UT 84084

300 East - 3900 South to 3970 South
Post-Bid
Millcreek, UT

Scottish Drive Roadway Area Roadway Reconstruction Project
Results
Cottonwood Heights, UT

Denali Therapeutics / Salt Lake City
New Construction, Infrastructure - 65,000 SF
Pending Verification
$40,000,000 CJ est. value
Salt Lake City, UT 84101

RFP Design - Murray Armory Building and Landscaping Renovation
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Murray, UT 84107

Last Updated 08/04/2022 09:31 AM
Project Title

Curb and Gutter Replacement

Physical Address View project details and contacts
City, State (County) Riverton, UT 84065   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $26,375 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 4, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** Quote to remove and replace approximately 200 to 300 linear foot of Type H Curb and Gutter. Work will be done in a subdivision called Charing Cross approximately 13200 South and 2600 West. Each section is approximately 10' long and we would like to remove 20-30 sections, depending on budget. All work must be done to APWA Standards, Plan 205.2 Type H. Provide an linear foot price. Price must include mobilization, traffic control, equipment, materials, labor, tools, transportation, supplies and incidentals necessary to complete the entire project. The right is reserved to cancel this Request for Quotation or to accept or reject any or all quotes, and to waive any informality or technicality in any quote, in the interest of Riverton City. Riverton City reserves the right to award multiple contracts to more than one vendor for the same or similar items. Riverton City reserves the right for an option to renew or extend any contract that may arise from this Request for Quotation, not to exceed four (4) renewals or extensions. Unless specifically provided for elsewhere in this quote, multiple or alternate quotes will not be accepted. The City Mayor and City Council reserves the right to purchase such brands as it desires, irrespective of price. The right is reserved, unless supplier countermands, to increase or decrease the quantity of any item(s) as the quoted price. Riverton City reserves the right to cancel any item(s) not delivered after the purchase order issued. Riverton City reserves the right to select some or all of the items from any vendor unless an "all or nothing" statement is included in the quote. Riverton City does not guarantee to make any purchase from this quote. Estimated quantities are for quoting purposes only and are not to be interpreted as a guarantee to purchase any amount. Contractor is required to get all permits, have the utilities disconnected, and complete the project within 45 calendar days after receipt of the Notice to Proceed. Inquiries Sent To: Craig Calvert E-Mail: ccalvert@rivertoncity.com

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents