Similar Projects
BF Tire Service Shop
Renovation, Alteration
Conception
Joliet, IL 60436

Houbolt Road Truck Stop
New Construction, Addition - 9,600 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
IL 60436

Food N Fuel Fueling Center
New Construction - 7,000 SF
Design
$1,500,000 est. value
Joliet, IL 60436

Dog Haus Restaurant
New Construction, Infrastructure - 651 SF
Design
$250,000 CJ est. value
Bolingbrook, IL 60490

Joliet Ottawa Water Main Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Joliet, IL 60434

Black Road Acres Phase 1 Water Main Improvements
Infrastructure
Bidding
$1,000,000 CJ est. value
Joliet, IL 60432

New Manhattan Junior High School - Bid Period 1
Infrastructure
Sub-Bidding
$85,000,000 CJ est. value
Manhattan, IL 60442

Lockport Chrysler Dodge Ram & Jeep
New Construction - 34,100 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Lockport, IL 60441

Truck Travel Center
New Construction
Post-Bid
Peotone, IL 60468

Site Work
Infrastructure
Results
New Lenox, IL 60451

Dog Park Electronic Gate Improvements
Infrastructure
Results
$383,200 CJ est. value
Joliet, IL 60432

Rod Baker Ford
New Construction - 55,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Plainfield, IL 60586

Pace Bus Maintenance & Storage Garage
New Construction - 500,000 SF
Construction
$52,000,000 est. value
Plainfield, IL 60544

Quick Trip Truck Stop
New Construction
Pending Verification
Joliet, IL 60435

Restaurant, Quick Trip & Hotel
Addition, Build-Out - 10,000 SF
Pending Verification
Romeoville, IL 60446

Last Updated 11/18/2022 11:01 AM
Project Title

Removal and Replacement of Fuel Station Controls - Lockport, Joliet, and Monee Locations

Physical Address View project details and contacts
City, State (County) Lockport, IL 60441   (Will County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Site Development, Vehicle Sales/Service
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $41,475 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

** As of November 18, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** For the removal and replacement of fuel station controls at three (3) will county department of transportation fueling stations: lockport, joliet, and monee locations The county of will reserves the right to accept or reject any or all bids or proposals received. Contractor shall include all labor, materials, tools, equipment, safety gear, and qualified supervision necessary for removal and replacement of existing fueling station controls at the following locations: 1240 Caton Farm Road, Lockport, IL 60441 16841 W. Laraway Road, Joliet, IL 60433 25930 S. Egyptian Trail, Monee, IL 60449 Removal and replacement of fuel station controls at all three locations must be scheduled to minimize disruptions to daily fueling operations. New fuel station controls must be operational on the date of initial installation. Not more than one fueling station can be removed from service at a time. 1.2 Contractor is responsible for removal and legal disposal of existing fuel station controls. New controls must be compatible with existing power configurations: 115 VAC/230VAC 50/60Hz 200 watts maximum. 1.3 New fuel station controls must include an operating temperature range of -40 degrees F to 120 degrees F. Color graphics display must be user-friendly, at least 7" in size and also function within this temperature range. 1.4 Cabinets and pedestals for fuel station controls must consist of powder-coated aluminum components to prevent deterioration from environmental conditions. Should you have any questions regarding this bid, please submit them in writing to Kevin Lynn, Purchasing Director, at klynn@willcountyillinois.com. The Contract is to commence after County Board Approval on November 17, 2022. Work must be completed on or before March 1, 2023.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents