Similar Projects
2022 Capital Improvements Bond Projects - City of Little Rock
New Construction, Infrastructure
Conception
$161,800,000 CJ est. value
Little Rock, AR 72201

2022 Capital Improvements Bond Projects - City of Little Rock
New Construction, Infrastructure
Conception
$161,800,000 CJ est. value
Little Rock, AR 72201

Sultana Museum and Interpretive Exhibits
Renovation, Infrastructure - 23,000 SF
Design
$400,000 CJ est. value
Marion, AR 72364

Big Red Convenience Store / Hot Springs
New Construction, Infrastructure - 4,100 SF
Design
$1,000,000 CJ est. value
Hot Springs, AR 71913

Main St. - Vandenberg Blvd. (Widening) (Jacksonville) (F)
Infrastructure
Bidding
$500,000 CJ est. value
Jacksonville, AR 72076

Main St. - Vandenberg Blvd. (Widening) (Jacksonville) (F)
Infrastructure
Bidding
$500,000 CJ est. value
Jacksonville, AR 72076

Water Project
Post-Bid
Less than $166,000 est. value
Nashville, AR

Water System Improvements: Contract II - Water Line Extension and Chlorination Facility
Post-Bid
El Dorado, AR

Water Quality Demonstration
Results
Less than $1,412,520 est. value
Conway, AR 72032

New Walking / Biking Trail on the Campus of ASU-MTN
Results
Mountain Home, AR

McReynolds Recreational Vehicle Park
New Construction
Construction
Siloam Springs, AR 72761

Bennett Office Space Parking Lot
Alteration
Construction
Searcy, AR 72143

Quapaw Subdivision - Master Plan
New Construction
Pending Verification
North Little Rock, AR

Marshalltown Tools Addition
Addition, Demolition, Infrastructure - 48,000 SF
Pending Verification
$26,000,000 CJ est. value
Fayetteville, AR 72701

Bentonville Public Library Expansion
Addition, Renovation, Infrastructure - 65,055 SF
Design
$12,000,000 CJ est. value
Bentonville, AR 72712

Last Updated 08/29/2022 08:01 PM
Project Title

Barnwell Drainage Improvements

Physical Address View project details and contacts
City, State (County) Cabot, AR 72023   (Lonoke County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Barnwell Drainage Improvements Bond 2021 The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The value range is $250,000 - $750,000 The major improvements for the project will consist of the following: 1. Improvements to a regional detention facility 2. Replacement of street culverts 3. Bank stabilization and channel improvements

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents