Similar Projects
Spring Rock Residential Community
New Construction, Infrastructure
Conception
$70,000,000 CJ est. value
Kuna, ID 83634

Spring Rock Residential Community
New Construction, Infrastructure
Conception
$70,000,000 CJ est. value
Kuna, ID 83634

Idaho Falls High School and Skyline High School - Idaho Falls SD 91
New Construction
Design
$100,000,000 est. value
Idaho Falls, ID 83402

Payette Lakes Middle School Expansion - 2021 Bond - McCall Donnelly School District
Addition
Design
$13,000,000 CJ est. value
McCall, ID 83638

Jefferson Elementary School Addition and Renovation
Addition, Demolition, Renovation, Infrastructure
Bidding
$300,000 CJ est. value
Jerome, ID 83338

New Malad Elementary School
New Construction, Infrastructure
Bidding
$2,300,000 CJ est. value
Malad City, ID 83252

Replace Sink
Alteration
Post-Bid
ID

Replace Hallway Flooring
Renovation, Alteration
Post-Bid
ID

Meridian Middle School Cafeteria Remodel
Renovation - 7,500 SF
Results
Meridian, ID 83642

Design Build Services for - Construction of K-12 School Facility
New Construction
Results
ID

Naples Elementary School Addition and Remodel and Mount Hall Elementary School Remodel
Addition, Demolition, Renovation, Infrastructure
Construction
$2,125,007 CJ est. value
Bonners Ferry, ID 83805

Blackfoot Elementary School
New Construction, Infrastructure - 46,313 SF
Construction
$10,000,000 CJ est. value
Blackfoot, ID 83221

Mayfield Springs Mixed-Use
New Construction, Infrastructure - 55,000 SF
Pending Verification
$900,000,000 CJ est. value
Mountain Home, ID 83647

2023 Bond - Nampa School District
Demolition, New Construction, Infrastructure, Renovation
Conception
$210,200,000 CJ est. value
Nampa, ID 83651

Atrium at Blackfoot High School
New Construction, Infrastructure
Design
$5,975,000 CJ est. value
Blackfoot, ID 83221

Last Updated 05/10/2023 09:36 AM
Project Title

PPCS MultiPurpose Room Improvements

Physical Address View project details and contacts
City, State (County) Moscow, ID 83843   (Latah County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $237,300 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 10, 2023, this project has not yet been awarded. The project is expected to be awarded next week The scope of work of the project includes improvements to the existing Multi-Purpose Room in the original school building constructed and opened in 2019. Work includes - but is not limited to the following: new 1 - 000 SF mezzanine and office addition inside the existing Multi-Purpose Room - including wood framing - interior chainlink - drywall - painting - related electrical - and related fire-sprinkler modifications; new 1 - 800 SF addition of the existing Multi-Purpose Room matching the existing 12 foot eave height and exterior and interior finishes - including new concrete foundation - wood framing - insulation - fiber-cement siding - asphalt shingle roof - vinyl windows - flooring - painting - related sitework - related fire sprinkler - mechanical and electrical; and new moveable partition wall. Bids must be accompanied by Bid Security in the form of a bid bond - certified check - cashier's check or cash in the amount of 5% of the bid proposal. Said bid security shall be forfeited to the Owner as liquidated damages should the successful bidder fail to enter into contract in accordance with their proposal as specified in the Instructions to Bidders

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents