Similar Projects
Applied Energy Services Adair County Solar Farm
New Construction, Infrastructure
Conception
$332,000,000 CJ est. value
Kirksville, MO 63501

Chapel Hill Connector - Perche Creek Trail - 00745 - 1949 - City of Columbia
Infrastructure
Conception
$500,000 CJ est. value
Columbia, MO 65203

Forum Boulevard - Green Meadows to Nifong - 00653 - City of Columbia
Infrastructure
Design
$2,250,000 CJ est. value
Columbia, MO 65203

Forum Boulevard - Green Meadows to Nifong - 00653 - City of Columbia
Infrastructure
Design
$2,250,000 CJ est. value
Columbia, MO 65203

Harrisburg R-VIII Elementary and Middle School Renovations
Addition, Demolition, Renovation, Infrastructure
Bidding
$5,000,000 CJ est. value
Harrisburg, MO 65256

Replace Water Lines Near South Well
Infrastructure
Bidding
$510,000 CJ est. value
Columbia, MO 65203

Road Maintenance
Term Contract
Post-Bid
Purdy, MO

Milling and Overlay for Columbia Streets - Multi Year
Term Contract
Post-Bid
Columbia, MO

Rough Site Grading, Parking and Storm Water System Installation
Infrastructure
Results
Columbia, MO

Bridge Washing on I-70 and Route
Infrastructure
Results
$250,000 to $500,000 est. value

RFQ Design - Professional Architectural and Engineering Design Consulting Services
New Construction, Infrastructure
Pending Verification
$67,000,000 CJ est. value
Columbia, MO 65203

Providence South Plaza
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Columbia, MO 65201

Extend Hinkson Creek Substation Feeders - E0193 - 1837 - City of Columbia
Infrastructure
Conception
$10,000,000 CJ est. value
Columbia, MO 65203

Warehouse and Enclosed Equipment Parking - E0176 - 1593 - City of Columbia
New Construction, Infrastructure
Design
$4,800,000 CJ est. value
Columbia, MO 65203

Emulsified Maltene-Based Asphalt Rejuvenating Agent and Sealer
Term Contract
Post-Bid
Columbia, MO

Last Updated 02/16/2023 02:21 PM
Project Title

Concrete Pavement Repair

Physical Address View project details and contacts
City, State (County) Butler, MO 64730   (Bates County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,237,904 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J7I3525 Route 13, 32, 54, 65, I-49 Bates, Benton, Cedar, Henry, St Clair, Vernon County. Concrete pavement repair on Route 13 St Clair Co., on Route 65 Benton Co., on Route 32 Cedar Co., on Route 54 Vernon Co., and on interchange ramps I-49 at Route B Bates Co., the total length of improvement being 41.916 miles. (2): Job J8P3242 Route Various Christian, Greene County. Concrete pavement repair at various locations in Greene and Christian Counties, the total length of improvement being 4.995 miles. Range: 1M to 2.5M Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of Missouri, acting by and Through the Missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. MODOT - G02 - Concrete Pavement Repair *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. FAS S603(87), FAS S604(36)

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents