Similar Projects
North Choctaw Road, East 66 Highway - 1100 Feet north of the intersection of N Choctaw Road and East 66 Highway (Ward 7) - City of Oklahoma City
New Construction, Demolition, Infrastructure
Conception
$415,000 est. value
Oklahoma City, OK 73054

Fabrication of Coffer Box for Mcclellan-Kerr Arkansas River Navigation
New Construction
Design
$1,000,000 to $5,000,000 est. value
Kerr, AR - Littleton, CO - Broken Arrow, Chouteau, Webbers Falls, OK 74014

Fabrication of Coffer Box for Mcclellan-Kerr Arkansas River Navigation
New Construction
Design
$1,000,000 to $5,000,000 est. value
Kerr, AR - Littleton, CO - Broken Arrow, Chouteau, Webbers Falls, OK 74014

Scott Parker Wentz Tunnel Rehabilitation
Alteration
Post-Bid
Stillwater, OK

Webbers Falls Stilling Basin Repairs
Renovation, Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value
Fort Sill, OK

Summit Lakes Dam Repair CMAR Services
Renovation
Results
Norman, OK 73026

Sluice Gate & Butterfly Valve Repair at Oologah Lake, Ok
Term Contract
Results
$500,000 to $1,000,000 est. value
Oologah, OK

Grade, Drain, Bridge and Surface - US 34
New Construction, Infrastructure
Design
$15,034,500 est. value
Sayre, OK

Navigation & Hydraulic Steel Structures Repair
Renovation
Post-Bid

Repairs to W.D. Mayo Lock and Dam 14, and Newt Graham Lock and Dam 18 -
Renovation
Results
$5,000,000 to $10,000,000 est. value
Claremore, OK 74017

Misty Lake Dam Rehabilitation
Renovation
Post-Bid
Norman, OK

Emergency Watershed Protection (EWP) Streambank Stabilization
Renovation
Results
Perkins, OK

R.S. Kerr Dam Tainter Gates Rehabilitation and Repairs
Renovation, Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value
Sallisaw, OK

Spavinaw Dam South Abutment Repair
Infrastructure
Results
$300,000 est. value
Tulsa, OK

Hominy Municipal Lake Siphon
Renovation, Infrastructure
Post-Bid
$250,000 est. value
Hominy, OK

Last Updated 07/20/2022 03:19 AM
Project Title

ARS Woodward Embankment Rehabilitation

Physical Address View project details and contacts
City, State (County) Woodward, OK   (Woodward County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitate this dam is a single purpose, high hazard, earthfill embankment constructed in 1937 with a drainage area of 14.4 square miles. The dam is not a floodwater retention structure, it is primarily used for irrigation and recreation. The site was reclassified as high hazard and must be rehabilitated to meet current high hazard criteria. The project will consist of boring and jacking a new 30” principal spillway pipe through the existing dam, building a new principal spillway tower, building a roller compacted concrete auxiliary spillway over the top of the existing dam, disposing of and filling in existing concrete auxiliary spillway – and includes clearing and grubbing and disposal of trees, snags, logs, brush, stumps, shrubs, and rubbish from designated areas.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents