Similar Projects
Replace Kitchen Vent Hood System - Dining Lodge
Renovation, Alteration
Bidding
$100,000 est. value
Kirksville, MO 63501

HVAC Units Replacement - 3010 North Industrial Road
Alteration
Bidding
$200,000 est. value
Kirksville, MO 63501

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Cypress Swamp HVAC Replacement 2021
Results
Saint Louis, MO

Kitchen Hoods Inspection and Cleaning
Results
Columbia, MO 65202

Replace HVAC, BAS, and Domestic Hot Water System
Alteration
Bidding
$300,000 est. value
Higginsville, MO 64037

Repair of East Cooling Tower for the City of Columbia Municipal Power Plant
Post-Bid
Columbia, MO 65201

Lange Middle Cooling Tower and Chiller Replacement
Results
Columbia, MO 65202

Preventative Maintenance for HVAC for the 2022-2023
Alteration
Bidding
Salem, MO

HVAC Services (City-Wide)
Term Contract, Alteration
Post-Bid
Springfield, MO

Ward Edwards NOC Cooling System Replacement Project
Results
Warrensburg, MO

HVAC Water Treatment Services
Alteration
Bidding
MO

WPLM Administration Building HVAC
Alteration
Post-Bid
Saint Joseph, MO

Heating Equipment
Results
Belton, MO 64012

Reported 05/12/2022 01:41 PM
Project Title

HVAC Unit at City Hall

Physical Address View project details and contacts
City, State (County) Byrnes Mill, MO 63051   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of a municipal facility in Byrnes Mill, Missouri. Completed plans call for the renovation of a municipal facility. As of 5/9/2022, this project has not yet been awarded. Timeline for award has not be established. The scope of work will include removing the existing 20-ton VAV unit and all controls in a manner which allows the unit to be offered for resale, ductwork may be discarded. The replacement HVAC will consist of three (3) independent, properly sized RTU's with ductwork, supplies, returns, and Wi-Fi thermostats included. Any exposed ductwork within the finished office space will be framed in steel studs and drywall taped and painted. Bid to include all electrical and concrete pads as needed. All trash to be hauled away.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Miscellaneous Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Refractory Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Steep Slope Roofing, Canvas Roofing, Roofing and Siding Panels, Membrane Roofing.
Division 08 - Openings, Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Roof Windows and Skylights, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Acoustic Underlayment, Painting and Coating.
Division 10 - Specialties, Information Specialties, Interior Specialties, Exterior Specialties.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 12 - Furnishings, Furniture, Multiple Seating.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Pool and Fountain Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Air Distribution, Central Heating Equipment, Central HVAC Equipment.
Division 26 - Electrical, Lighting.
Division 27 - Communications, Voice Communications, Distributed Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Site Improvements, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Hydronic and Steam Energy Utilities, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Piece Material Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents