Similar Projects
Highway Safety and Drainage Improvements
Renovation
Design
Calverton, Wainscott, NY 11933

Design-Build Services for the Rockaway Line Long Term Flood Mitigation
Infrastructure
Bidding
$100,000,000 est. value
NY

Design-Build Services for Flood Mitigation at Twenty-Six Substations
Infrastructure
Bidding
$50,000,000 to $100,000,000 est. value
Brooklyn, Manhattan, NY

Replacement of Culverts at West Main Street and Grant Street
Post-Bid
Middletown, NY 10940

Limestone Creek and Bishop Brook Stream Bank and Riparian Buffer Improvement
Post-Bid
Fayetteville, NY

Mirror Lake Drive Sidewalk, Drainage and Pavement Improvements
Results
Less than $1,100,000 est. value
Lake Placid, NY

Webster Avenue Drainage Improvements - Washington Avenue to Lockwood Avenue
Results
New Rochelle, NY 10801

FEMA Repairs from Flooding
Infrastructure
Bidding
$106,590 to $144,211 est. value
Orient, NY 11957

Pre-Cast Catch Basin and Frame and Grate
Term Contract
Post-Bid
Schenectady, NY

North Road Culvert (CN 80-0.66) Sliplining
Results
Windsor, NY

Olcott Beach Berm and Drainage Improvements
Infrastructure
Bidding
$2,000,000 est. value
Olcott, NY

Underdrain Installation and Connection at Misc. Locations
Post-Bid
Endwell, NY

Guide Railing and Drainage Requirements Contract
Results
Less than $2,000,000 est. value
NY

Playground/Flood Elimination
Infrastructure
Bidding
$1,000,001 to $4,000,000 est. value
Staten Island, NY 10314

Warner Creek at WC-1 & Wc-2 River Restoration Project
Post-Bid
Chichester, NY 12416

Reported 06/03/2022 12:00 AM
Project Title

East Kill Streambank Stabilization near CR78 Bridge - 2022 Repair

Physical Address View project details and contacts
City, State (County) Tannersville, NY 12424   (Greene County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of the restoration of approximately 200 linear feet of stream channel, and will include excavation and fill to create a new aligned stream channel as well as construction of rock riprap revetment. Work items also include the installation of various bioengineering practices and various plantings.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents