Similar Projects
Polk-Quincy - 701048.0 - City of Topeka
Infrastructure
Conception
$7,000,000 est. value
Topeka, KS

South Kansas Avenue(4th to 6th Avenue) - 841095 - City of Topeka
Alteration
Conception
$892,045 est. value
Topeka, KS 66630

New Washburn Rural Middle School - 2022 Bond - Auburn Washburn Public Schools
New Construction, Infrastructure - 138,000 SF
Design
$48,647,000 CJ est. value
Mission, KS 66614

New Washburn Rural Middle School - 2022 Bond - Auburn Washburn Public Schools
New Construction, Infrastructure - 138,000 SF
Design
$48,647,000 CJ est. value
Mission, KS 66614

E Dorm Perimeter Fencing
Infrastructure
Bidding
$40,000 CJ est. value
Topeka, KS 66612

E Dorm Perimeter Fencing
Infrastructure
Bidding
$40,000 CJ est. value
Topeka, KS 66612

South Topeka Blvd BNSF Rail Crossing Removal & Pavement Replacement
Infrastructure
Post-Bid
Topeka, KS

Topeka Regional Business Center - Bldg. 612 Drainage Improvements
Infrastructure
Post-Bid
$100,000 CJ est. value
Topeka, KS 66612

2021 - 2022 Sidewalk Repairs & Improvements
Infrastructure
Results
Lenexa, KS

South East California Avenue 45th Street to 37th Street Trafficway and Utility Improvements
Infrastructure
Results
Topeka, KS 66630

Replacing the Bridge on SW 61st Street Over Six-Mile Creek
Demolition, New Construction, Infrastructure
Construction
$863,802 CJ est. value
Topeka, KS 66610

Replacing the Bridge on SW 61st Street Over Six-Mile Creek
Demolition, New Construction, Infrastructure
Construction
$863,802 CJ est. value
Topeka, KS 66610

Hill's Pet Nutrition Expansion / Project Prince
New Construction, Infrastructure
Pending Verification
$31,400,000 CJ est. value
Topeka, KS 66617

Downtown Ramada Hotel & Convention Center Remodel
Build-out
Pending Verification
$4,882,168 CJ est. value
Topeka, KS 66607

South Topeka Boulevard from 15th to 21st - 701045 - City of Topeka
Infrastructure
Conception
$4,700,000 est. value
Topeka, KS 66630

Last Updated 06/22/2023 12:21 PM
Project Title

North Parking Lot Repairs & Striping

Physical Address View project details and contacts
City, State (County) Topeka, KS 66607   (Shawnee County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $92,530 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, materials, and equipment necessary to cold mill parking lot, full depth patch concrete base (various locations), overlay with 2 HMAC and paint strip parking lot spaces Shawnee County reserve the right to accept or reject any part of, or all of, any bid or proposal. PRE-CONSTRUCTION CONFERENCE: Wednesday May 3, 2023 at 1:00 PM in Shawnee County Public Works Conference Room, 2nd Floor, Shawnee County Annex 1515 NW Saline Street START WORK ORDER ISSUED: Monday May 15, 2023 SUBSTANTIAL COMPLETION & FINAL ACCEPTANCE: Friday June 30, 2023 North Parking Lot Repairs & Striping at SNCO Adult Detention Center, 501 SE 8th Ave.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents