Similar Projects
Drainage Rehabilitation and Sliplining Mileposts
Infrastructure
Bidding

Parking Lot and Drainage Improvements at Lincoln Park Middle School
Post-Bid
$351,488 est. value
Lincoln Park, NJ 07035

Millbrook Avenue Retaining Wall Project
Post-Bid
Randolph, NJ 07869

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Youth Center Field House Drainage and Sidewalk Improvement at Community Park
Results
Montville, NJ 07045

Olympia Drive Drainage Improvements
Post-Bid
East Hanover, NJ 07936

Pompton River De-Snagging Project
Results
Pompton Plains, NJ 07444

Drainage Improvements Boonton Avenue (C.R. 511)
Infrastructure
Post-Bid
Boonton, NJ 07005

Drainage Pipe
Term Contract
Results
Randolph, NJ 07869

Main Road Storm Drainage Improvements Township of Montville
Results
Montville, NJ 07963

Police and Fire Academy Storm Drainage Improvements Township of Parsippany-Troy Hill
Results
Parsippany, Troy Hills, NJ 07963

Maintenance Timber and Underwater Structural Repair Contract, North - 2021
Results
$5,000,001 to $10,000,000 est. value

Meadow Restoration at The Frelinghuysen Arboretum
Results
Morristown, NJ 07960

Rock Slope Scaling Schooley`s Mountain Road (Cr 517)
Results
Long Valley, NJ 07853

Gathering/ Hilldale Drainage Improvements Project
Results
Montville, NJ

Last Updated 02/23/2022 01:15 PM
Project Title

Hill Street Slope Failure Repair

Physical Address View project details and contacts
City, State (County) Boonton, NJ 07005   (Morris County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of improvements to Hill Street, between Highland Avenue and Pine Street. This includes the replacement of select roadway pavement, concrete curb, retaining wall, guide rails, slope stabilization, maintenance and protection of traffic, and site restoration. Complementary work to furnish and install accessory materials as may be necessary may be if and where directed items by the Owner. The contractor shall be responsible for providing all labor, supervision, trade skills, materials, and equipment required for this project as described in the Construction Documents.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents