Similar Projects
Window and Floor Replacements (SNAMHS 1, 2, 3A, 6)
Term Contract
Bidding
$692,158 est. value
Las Vegas, NV 89146

Task-Order Inspector Services
Term Contract
Bidding
Las Vegas, NV

Tri-Annual Life Safety Inspections and Survey
Post-Bid
Las Vegas, Laughlin, Pahrump, NV

Professional Services
Renovation, Infrastructure, Alteration
Post-Bid
Las Vegas, NV

Overhead Door Maintenance and Repair
Results
Las Vegas, NV

C--Annual Facility Safety Inspections
Term Contract
Results

Glass Repair and Replacement Services
Alteration
Bidding
Las Vegas, NV 89146

R425--36C26121q0642 | Tri-Annual Life Safety Inspections
Term Contract
Post-Bid
Henderson, Las Vegas, Laughlin, North Las Vegas, Pahrump, NV 89086

Automatic Door Repair Services Countywide
Term Contract, Alteration
Results
$100,000 est. value
NV

Window Blinds and Doors Replacement Services
Term Contract, Alteration
Bidding
Las Vegas, NV

Safety Survey
Term Contract
Post-Bid
Las Vegas, Nellis Air Force Base, NV 89191

HND Northwest Apron Expansion Material Testing Services
Infrastructure
Results
NV

Automatic Door Repair Services Countywide
Alteration
Bidding
NV

Base + 4OYs Fuel tank Inspection and Certification
Term Contract
Post-Bid
Las Vegas, NV

Lake - Annual Fire System Inspections
Term Contract
Results
Boulder City, NV

Reported 06/16/2022 12:00 AM
Project Title

Safety Door Refurbishment at Hoover Dam

Physical Address View project details and contacts
City, State (County) Boulder City, NV   (Clark County)
Category(s) Professional Services, Single Trades
Sub-Category(s) Inspection Services, Windows/Doors
Contracting Method Competitive Bids.
Project Status Accepting Qualifications, Construction Start Expected December 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Door Type Qty Location Operating Method Penstock Safety 13 Powerhouse gallery entrance to lateral tunnel Manual, spring-assisted with float mechanism Upper Tunnel 7 Upper penstock tunnel Manual, counterweight-assisted No.2 Anchor 8 Lower penstock tunnel Manual, spring-assisted Plug 2 NV and AZ outlet plug Manual, spring-assisted Instructions/details for each door will be included in in the attached Statement of Work. The principal components of work include: 1. Inspection of doors, frames, operating mechanisms, and wear parts. 2. Refurbishment or replacement of the operating mechanisms to open and close the doors as the original equipment manufacturer intended. 3. Refurbishment of the door frames. 4. Preparation and recoating of all areas with missing coating or corrosion which include doors, frames, and appurtenant components.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents