Similar Projects
Transformer - Utilities and Energy
Post-Bid
Auburn, AL

Generator Maintenance
Term Contract
Post-Bid
Huntsville, AL 35801

Z--Replace/Upgrade Electrical Switchgear Phase 3
Results
$1,000,000 to $5,000,000 est. value
Birmingham, AL 35233

J--Electrical Voltage Testing
Results
Tuskegee, AL 36083

Lighting of Exit 46
Post-Bid
Less than $280,000 est. value
Carbon Hill, AL

One (1) 115 Kv Circuit Switchers at the Silverhill Substation
Results
Foley, AL

Freedom Manor Solar Project
Post-Bid
Birmingham, AL 35203

Switchgear at Jones Bluff Powerhouse
Results
Selma, AL 36701

Lighting Improvements at the Capitol Complex
Post-Bid
$500,000 to $700,000 est. value
Montgomery, AL 36104

Theater Lighting
Results
Less than $19,616 est. value
Huntsville, AL

Henry Peters Electric Service
Post-Bid
$200,000 to $225,000 est. value
Birmingham, AL

Electrical Improvements at The Champions Monument
Results
Gadsden, AL

LED Relamping
Post-Bid
Tuscaloosa, AL 35403

Sports Light Fixtures
Term Contract
Results
Mobile, AL 36618

Switchgears - Utilities and Energy
Post-Bid
Auburn, AL 368495101

Reported 02/14/2020 12:00 AM
Project Title

Gym Awning Lights

Physical Address View project details and contacts
City, State (County) Enterprise, AL   (Coffee County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Remove and dispose of four (4) existing metal halide wall pack fixtures and associated raceway conduit. 2. Install eight (8) new owner provided metal halide wall pack fixtures. 3. Existing electrical circuits are to be reused and new fixtures supported per the manufacturer's specifications. 4. All work should be performed in accordance with the National Electrical Code requirements. 5. Follow all product manufacturer's directions, specifications and recommendations. 6. Thoroughly clean all work areas to include sweeping, mopping and wiping down all surfaces (walls, window sills, furnishing, etc.). Clean up should be performed each day prior to exiting the site.

Details

Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents