Similar Projects
Church Road Sidewalk
Infrastructure
Bidding
GA

CVS #4740 Partial ADA Project
Renovation
Post-Bid
Smyrna, GA 30080

CVS #2147 Partial ADA Project
Renovation
Post-Bid
Kennesaw, GA 30152

Fiberglass Reinforced Polymer Walking Surface
Results
Atlanta, GA

Church Street Sidewalk
Results
Smyrna, GA

General Infrastructure Construction Services for Minor Projects
Post-Bid
Marietta, GA

Buckner Road Sidewalk
Results
Marietta, GA

Hotel Street - Sidewalk
Infrastructure
Post-Bid
Austell, GA 30106

Kennesaw Avenue Streetscapes
Results
Marietta, GA 30006

Cameron Springs Repairs and Improvements Project
Results
Powder Springs, GA

Manget Street at Lakewood Drive Intersection Improvements
Results
Marietta, GA

Paving at Marietta Middle School Parking Lot
Term Contract, Infrastructure
Results
$115,055 est. value
Marietta, GA 30064

Annual Contract for Maintenance Repairs of Sidewalks Curbs Driveways Aprons
Infrastructure
Results
Atlanta, GA

Bouldercrest Drive Sidewalk Enhancement
Infrastructure
Results
$153,176 est. value
Marietta, GA 30064

Mountain Brook Sidewalk Access
Infrastructure
Results
$189,500 est. value
Marietta, GA 30064

Last Updated 03/30/2022 09:27 AM
Project Title

Paving - Transportation Facility

Physical Address View project details and contacts
City, State (County) Marietta, GA 30060   (Cobb County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $219,980
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The Project includes to mill and remove old asphalt surfacing for an area in the Transportation facility parking lot. Contractor will remove and discard all debris, forms, parking stops, and trash. Contractor must locate all utilities. Contractor will provide all material and labor to complete the assigned work. Contractor will mill area down to existing sub base and pave with 2” of 19mm Asphalt Binder, 2” of 9.5mm Asphalt Topping, and properly compact. (Approximately 5,701 SY). Contractor will remove all bus and passenger vehicle Curb Stops and replace with new. Contractor will remove and replace approximately 170 LF of Curb and Gutter.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents