Similar Projects
Valley View Center for Nursing Care Addition - RTU
Alteration
Design
Greenvale, NY 11548

Gold Coast Library
New Construction - 10,991 SF
Design
$11,300,000 est. value
Glen Head, NY

Garden City Public Library HVAC System Replacement 2022
Alteration
Bidding
$760,000 est. value
Garden City, NY 11530

Additions and Alterations at Lawrence Road Middle School - Contract H Hvac Work
Alteration
Bidding
$600,000 est. value
Hempstead, NY 11550

Air Conditioning at Manorhaven Elementary School and South Salem Elementary School and Sousa Auditorium - Mechanical Construction
Renovation
Sub-Bidding
$1,007,000 CJ est. value
Port Washington, NY 11050

Air Conditioning at Manorhaven Elementary School and South Salem Elementary School and Sousa Auditorium - Mechanical Construction
Renovation
Sub-Bidding
$1,007,000 CJ est. value
Port Washington, NY 11050

Laundry Exhaust Duct Cleaning
Alteration
Post-Bid
NY

HVAC & Refrigeration Replacement & Maintenance For Lukoil Service Stations
Alteration
Post-Bid

Parkville Branch Interior
Renovation
Results
New Hyde Park, NY 11040

Vestibule and Reading Room Window Replacement and HVAC Upgrades
Alteration
Results
$350,050 est. value
Bellmore, NY 11710

Additions and Alterations at EM Baker Elementary School.
Addition, Demolition, Renovation, Infrastructure
Bidding
$200,000 CJ est. value
Great Neck, NY 11023

Building Additions and Interior Alterations at Uniondale High School - Contract H Hvac Work (Building Additions)
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$300,000 CJ est. value
Uniondale, NY 11553

Mechanical System Upgrade for Firing Range
Term Contract
Post-Bid
Great Neck, NY 11024

Tully Park HVAC Improvements
Alteration
Results
New Hyde Park, NY 11040

Building Additions and Alterations at Sousa Elementary School - General Construction
Addition, Demolition, Renovation, Infrastructure
Bidding
$340,000 CJ est. value
Port Washington, NY 11050

Last Updated 07/26/2022 11:09 AM
Project Title

Ann MacArthur Primary School (AMPS) Library HVAC Replacement

Physical Address View project details and contacts
City, State (County) Locust Valley, NY 11560   (Nassau County)
Category(s) Education, Government/Public, Single Trades
Sub-Category(s) Elementary School, HVAC, Library - Public
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Copy Center - 07/11/22
Owner View project details and contacts
Architect View project details and contacts
Description

AMPS Library HVAC Replacement SED# 28-05-03-06-0-010-020 ,Ann MacArthur Primary School 100 Ryefield Road Locust Valley, NY 11560 All proposals shall be based upon the information contained in the Drawings, Project Manual and any Addenda issued during the Bid Period, all as prepared by the Architect. Proposals shall be submitted for the following contracts: Contract No. AMPS-1 Single Prime Mechanical Contract Deposit checks shall be made payable to LOCUST VALLEY CENTRAL SCHOOL DISTRICT. Contractors submitting prime bids may obtain a refund of deposit by returning the complete printed set of documents to MadisonLohrius in good, usable condition, within thirty (30) days. Any contractor not bidding who returns the bid package after the bid date shall forfeit their bid deposit. BIDDERS REQUIRING DOCUMENTS TO BE SHIPPED SHALL MAKE ARRANGEMENTS WITH MADISON LOHRIUS and pay for all packaging and shipping costs. All questions regarding this project shall be in writing and shall be directed to the Architect. The Architect will respond to the questions in the form of an Addendum. In order to allow time for the distribution of an addendum, the last day for questions shall be TUESDAY JULY 19, 2022 Each bid must be accompanied by a Certified Check or Bid Bond made payable to the Board of Education, Locust Valley Central School District in the amount of not less than ten (10%) percent of the amount of bid. This must be deposited by each bidder with his bid as guarantee that in the event the contract is awarded to him, he will, within fifteen (15) days after written notification of such award or intent to award, execute the contract and furnish the performance and payment bonds with a surety satisfactory to the Board of Education. Upon failure to do so, the bidder shall forfeit the deposit (Certified Check or Bid Bond) or an amount equal thereto, as liquidated damages. Acceptance of the bid will be contingent upon the fulfillment of these requirements by the bidder.The Certified Checks or Bid Bonds will be returned when the Board of Education has approved the executed contract or rejected all bids. The successful bidder will be required to furnish a Performance Bond, Labor and Material Payment Bond in the amount of one hundred twenty-five (125%) percent of the accepted bids, guaranteeing performance according to Specifications and the Payment of all obligations arising thereunder. The bidder will also be required to show to the Board of Education that he is carrying Workmen's Compensation Insurance as required by law, and all other insurance in an amount not less than specified under Section 00652.Any Bid Addenda issued by the architect will be transmitted to registered plan holders via email and will also be available at portal The Contract will be awarded to the lowest responsible bidder or the proposal will be rejected within sixty (60) days of the date of the opening of proposals, subject, however, to the discretionary right reserved by the Board of Education to waive any informalities in, or to reject any or all proposals and to advertise for new proposals, if, in its opinion, the best interest of the District will thereby be promoted. All bids will be held firm by the Board of Education for sixty (60) days after formal opening thereof and no bid may be withdrawn within sixty (60) days pending the decision of the Board, except for clerical mistake pursuant to the requirement of General Municipal Law 103. 2021-2022

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Library Equipment, Library Stack Systems, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Portable Audience Seating, Seat and Table Assemblies.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents