Similar Projects
Replace LCK Terminal HVAC Roof Top Units (RTUs) No.1 and No.3 (40 ton units) at Rickenbacker International Airport
Renovation
Sub-Bidding
$290,000 CJ est. value
Columbus, OH 43217

Replace CMH Terminal Pre-Conditioned Air Units (PCAUs) at Gates B49 and B51 Project
Renovation
Sub-Bidding
$265,000 CJ est. value
Columbus, OH 43219

Oil Cooler
Alteration
Post-Bid
Lockbourne, OH

J041--Quarterly Maintenance (4 York Chillers)
Term Contract
Post-Bid
Columbus, OH 43219

Ohio National Guard Controlled Humidity Protection
Results
$50,000 to $80,000 est. value
Columbus, OH 43235

Hilliard Darby High School Cooling Tower Replacement
Results
Hilliard, OH 43026

2023 Capital Improvements HVAC
Renovation
Sub-Bidding
$2,263,800 CJ est. value
Westerville, OH 43081

IBMR Chiller Replacement
Alteration
Post-Bid
$999,383 est. value
OH 43201

Design-Build Services HVAC Phase XIII-B at Two Schools
Alteration
Results
$4,800,000 to $5,000,000 est. value
Columbus, OH 43224

2023 Source Capture Exhaust System
Renovation
Sub-Bidding
$100,000 CJ est. value
Worthington, OH 43085

HVAC Replacements FY 2020 Project
Alteration
Post-Bid
$3,200,000 est. value
Columbus, OH 43210

Design-Build Services HVAC Phase XIII-A at Three Schools
Alteration
Results
$6,000,000 to $6,300,000 est. value
Columbus, OH 43204

IQ - Swamp Fan Service and Repair
Alteration
Post-Bid
$1,000 est. value
Columbus, OH

FMC Chiller Replacement Zone A and B
Alteration
Results
$392,439 est. value
Columbus, OH 43223

2021 HVAC Improvements - Riverside Elementary Project
Alteration
Post-Bid
$2,500,000 est. value
Dublin, OH 43017

Last Updated 02/03/2023 04:05 PM
Project Title

Freezer / Cooler Replacements at Hayes Intermediate School

Physical Address View project details and contacts
City, State (County) Grove City, OH 43123   (Franklin County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $95,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

For Freezer / Cooler Replacements at Hayes Intermediate School For the furnishing of materials, labor, equipment and services necessary for and incidental to the Walk-in freezer/cooler replacements at Hayes intermediate school Bid Bond: 5% Performance Bond: 100% Payment Bond: 100% Completion Date: Substantial Completion August 4, 2023 Final Completion August 11, 2023

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents