Similar Projects
Cross Creek Park Construction - C80005000 - Hillsborough County
New Construction, Infrastructure
Conception
$1,854,000 CJ est. value
Tampa Palms, FL 33647

Cross Creek Park Construction - C80005000 - Hillsborough County
New Construction, Infrastructure
Conception
$1,854,000 CJ est. value
Tampa Palms, FL 33647

Gas Worx - Phase 1
New Construction, Infrastructure - 20,000 SF
Design
$67,000,000 CJ est. value
Tampa, FL 33605

Gas Worx - Phase 1
New Construction, Infrastructure - 20,000 SF
Design
$67,000,000 CJ est. value
Tampa, FL 33605

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - US Business 41
Infrastructure
Bidding
$40,000,000 CJ est. value
Thonotosassa, FL 33592

CDBG Street Resurfacing
Post-Bid
Plant City, FL

Garage Sweeping Services for County Parking Areas and Garages
Infrastructure
Post-Bid
$100,000 est. value
FL

I-75 MLK DDI
Results
FL

Design-Build for South County Advanced Wastewater Treatment Facility Expansion
Addition
Results
$50,000,000 est. value
FL

Epicurean Hotel Expansion
Demolition, New Construction, Infrastructure
Construction
$21,000,000 CJ est. value
Tampa, FL 33602

The Motor Enclave
New Construction - 16,000 SF
Construction
$100,000,000 est. value
Tampa, FL 33610

Local Tampa
New Construction, Infrastructure - 14,000 SF
Pending Verification
$88,300,000 CJ est. value
Tampa, FL 33606

Local Tampa
New Construction, Infrastructure - 14,000 SF
Pending Verification
$88,300,000 CJ est. value
Tampa, FL 33606

East 131St Avenue Improvements - North 30th Street To US 41 - C69642000 - Hillsborough County
Infrastructure
Conception
$13,969,698 CJ est. value
Tampa, FL 33612

Last Updated 01/03/2023 10:35 AM
Project Title

Water Treatment Plant No. 5

Physical Address View project details and contacts
City, State (County) Plant City, FL 33563   (Hillsborough County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $9,100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Plant City, Florida seeks bids from qualified vendors to furnish all labor, materials, supervision, equipment, tools, transportation and supplies necessary for the Water Treatment Plant No. 5 project, as indicated herein Plant City Procurement Division is the only staff designated and authorized to answer questions about this bid. Bidders may rely only on written responses or interpretations from the Procurement Division. Verbal and/or written responses given by other City staff in response to bidder questions shall not be binding on the City. The City will recognize written addenda issued by the Procurement Division as the only legitimate method of responding to questions about this bid or the project described within this bid. The deadline to submit questions is not later than 3:00 PM local time on Monday, Octover 10, 2022. Questions shall be submitted in writing to the Procurement Division at cpcprocurement@plantcitygov.com. Questions should include reference of the IFB name and number in the subject line. All answers will be issued in writing, via addendum The City reserves the right to reject any or all bids at any time and for any reason or no reason. Bids submitted after the deadline shall be rejected. Bids submitted in an unsealed or incorrectly marked envelope or box shall be rejected. Fax, e-mail, or telephone bids shall be rejected. Bids that are incomplete, unbalanced, conditional, obscure, or which contain terms or additions not called for, alterations or irregularities of any kind, or which do not comply with the contract documents, if applicable, may be rejected at the sole discretion of the City. Bids shall be valid for no less than 90 days from the submittal deadline. The time for substantial completion on this project shall be 425 days from Notice to Proceed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents