Similar Projects
Clearwater Multimodal Transit Center
New Construction - 75,000 SF
Conception
$34,000,000 est. value
Clearwater, FL 33757

Port St. Lucie Intermodal Facility
New Construction
Conception
FL

Ground Transportation Center Project
New Construction
Design
Sarasota, FL 34243

Miami International Airport (MIA) Central Terminal Ticket Counters, Conveyors, and K-1 Doors for TC 12 through TC 17
Renovation
Bidding
$525,000 est. value
Miami, FL 33126

Airport Terminal Building Renovations
Renovation
Bidding
$700,000 est. value
Live Oak, FL 32060

Airsides A and E Security Screening Checkpoint Expansion
Addition
Sub-Bidding
$4,661,871 est. value
Tampa, FL 33607

Airside A Passenger Boarding Bridge Replacement At Tampa International Airport
Post-Bid
Less than $20,497,996 est. value
Tampa, FL 33607

FL Keys Marathon Airport Non-Aeronautical Use Building (EOC)
- 23,000 SF
Post-Bid
Marathon, FL

Design/Build Firms for the Buildout of STC Airline and Tenant Spaces Program
Build-Out
Results
Orlando, FL 32827

Construction of Satellite Concourse "C" at VPS
Results
Eglin AFB, FL 32542

Virgin Voyages - Terminal V
New Construction
Construction
$150,000,000 est. value
Miami, FL

Greyhound Bus Terminal - Permanent Location
New Construction - 12,000 SF
Construction
$1,300,000 est. value
Daytona Beach, FL 32114

Lilium Vertiports
New Construction
Pending Verification
Orlando, FL

Ferry Expansion
New Construction
Pending Verification
Redwood City, San Francisco, CA - Mission Bay, FL 94158

Bolt Replacement - T2 Loading Bridges
Post-Bid
$17,000 est. value
Fort Lauderdale, FL

Last Updated 06/01/2022 01:08 AM
Project Title

Escalators Modernization at Pensacola International Airport

Physical Address View project details and contacts
City, State (County) Pensacola, FL 32504   (Escambia County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Modernizing the two existing Montgomery Elevator Company escalators in the main terminal building. The escalators have a rise of 13’-4”. The escalators centrally surround a stair and are contained by vertical masonry shafts on opposite ends. The project will require the Contractor to cordon off one escalator at a time with non-penetrating barricades and maintain all other passenger movements. The Contractor will carefully remove all aspects of the existing escalator, its rails, pumps, equipment, motors, finishes and hardware components, essentially reducing the existing equipment to its two truss rails which span floor to floor. Consideration must be given to the ability to access this work zone directly from the lobby and the amount of heavy lifting equipment necessary to stage both demolition and rebuilding.

Details

Airline/Passenger Terminal, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 14 - Conveying Equipment, Escalators.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents