500 North - 700 East to 900 East - City of Provo
Infrastructure
Conception
Provo, UT 84601

500 West - 1560 South to 920 South
Alteration
Conception
$1,800,000 est. value
Provo, UT 84601

Eagle Mountain Medical Office Building
New Construction, Infrastructure - 11,434 SF
Design
$7,000,000 CJ est. value
Eagle Mountain, UT 84005

2022 Santaquin Center Street Storm Drain Improvements Project
Infrastructure
Design
$883,409 CJ est. value
Santaquin, UT 84655

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Heritage Park Utility Pipelines
Infrastructure
Post-Bid

CM/GC for Cold Springs Transmission Pipeline Rehabilitation 2021
Infrastructure
Results
Spanish Fork, UT

Vineyard City Phase 1 Water Distribution Pipeline
Infrastructure
Results
Vineyard, UT

The Crossing
New Construction
Construction
Saratoga Springs, UT 84045

Active Auto / Spanish Fork
New Construction, Infrastructure - 12,350 SF
Construction
$3,300,000 CJ est. value
Spanish Fork, UT 84660

East Center Street Townhomes
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Spanish Fork, UT 84660

Red Bridge - Pid Super Pad
Alteration
Pending Verification
Orem, UT

24" Transmission Line 1730 North - 1500 West to 1680 North Geneva - City of Provo
Infrastructure
Conception
$8,000,000 est. value
Provo, UT 84603

Harvey Well Deepening Project
Infrastructure
Design
$170,000 CJ est. value
Cedar Hills, UT 84062

1100 North Street and Waterline Project
Infrastructure
Post-Bid
Pleasant Grove, UT 84062

Last Updated 05/08/2023 01:06 PM
Project Title

48-inch Transmission Line/Canyon 36" - 4045 - City of Provo

Physical Address View project details and contacts
City, State (County) Provo, UT 84601   (Utah County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $5,375,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Description and Justification: Build 48-inch water transmission line from Gillispie Wier house to main reservoirs to provide additional capacity as well as backup to existing 48-inch transmission line. Continue main line improvements up Provo Canyon to improve pressure and reduce need for pump stations and associated long-term maintenance costs. The project is included in the city's 2023-2027 Capital Improvement Program (CIP). As of May 8, 2023, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans